Reasons and control measures for viscous bulking of activated sludge in A2O process

Sludge viscosity expansion has always been a difficulty in the operation control of A2O process. The sludge viscosity expansion problem occurred in a sewage treatment plant in Zhengzhou City, resulting in poor sludge settling performance with SVI gradually increasing to about 240 mL/g and the mud le...

Full description

Bibliographic Details
Published in:Gongye shui chuli
Main Authors: ZHAO Xiaojuan, ZHANG Zhirui, LIU Dongyang, LEI Bin
Format: Article
Language:Chinese
Published: Editorial Office of Industrial Water Treatment 2024-04-01
Subjects:
Online Access:https://www.iwt.cn/CN/10.19965/j.cnki.iwt.2023-0608