Joint flood control scheduling strategy of large cascade reservoirs: A case study of the cascade reservoirs in the upper reaches of the Yangtze River in China
Abstract The flood control ability of cascade reservoirs is affected by many factors, such as the inflow flood form, and flood control scheduling rules. When large cascade reservoirs were built, it is necessary to evaluate the overall flood control ability of the reservoirs and explore the best join...
| Published in: | Journal of Flood Risk Management |
|---|---|
| Main Authors: | , , , |
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2022-09-01
|
| Subjects: | |
| Online Access: | https://doi.org/10.1111/jfr3.12802 |
