Joint flood control scheduling strategy of large cascade reservoirs: A case study of the cascade reservoirs in the upper reaches of the Yangtze River in China

Abstract The flood control ability of cascade reservoirs is affected by many factors, such as the inflow flood form, and flood control scheduling rules. When large cascade reservoirs were built, it is necessary to evaluate the overall flood control ability of the reservoirs and explore the best join...

Full description

Bibliographic Details
Published in:Journal of Flood Risk Management
Main Authors: Zhu Jing, Rongqi Zhang, Hexin Bao, Shanghong Zhang
Format: Article
Language:English
Published: Wiley 2022-09-01
Subjects:
Online Access:https://doi.org/10.1111/jfr3.12802