Development and Application of a Model Test Platform of Synchronous Technology Combining Shield Tunneling with Segment Assembling
Taking a running tunnel of Shanghai Railway Airport connecting line as a demonstration application project, the synchronous technology combining shield tunneling with segment assembling is proposed based on the active control on the oil pressure of the shield thrust system, which can solve the probl...
| الحاوية / القاعدة: | Shanghai Jiaotong Daxue xuebao |
|---|---|
| المؤلف الرئيسي: | |
| التنسيق: | مقال |
| اللغة: | الصينية |
| منشور في: |
Editorial Office of Journal of Shanghai Jiao Tong University
2022-07-01
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://xuebao.sjtu.edu.cn/article/2022/1006-2467/1006-2467-56-7-897.shtml |
