Determination the limit capacity of production the roof coal series at the open pit Gacko-Central Field in a function of use a discontinuous-combined exploitation system
This paper presents the methodology of determining and analysis results of the limit production capacity of coal in the roof exploitation zone of the open pit Gacko-Central Field in a function of configuration and parameters of the combined system. The coal exploitation system at the open pit Gacko-...
| 出版年: | Mining and Metallurgy Engineering Bor |
|---|---|
| 主要な著者: | , , , |
| フォーマット: | 論文 |
| 言語: | 英語 |
| 出版事項: |
Mining and Metallurgy Institute, Bor
2019-01-01
|
| 主題: | |
| オンライン・アクセス: | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2019/2334-88361901041S.pdf |
