Implementing Fuzzy TOPSIS on Project Risk Variable Ranking
Managing construction risks with a large number of risks with small impact can increase the additional effort and cost of inefficient construction. Therefore the variables need to be eliminated. The aim of this study is ranking the risk variable based on its frequency of occurrence by integrating ti...
| Published in: | Advances in Civil Engineering |
|---|---|
| Main Authors: | , , , |
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2019-01-01
|
| Online Access: | http://dx.doi.org/10.1155/2019/9283409 |
