Disturbance Response and Control of Shield Construction Adjacent to Bridge and High-rise Buildings

[Objective]The tunnel between Shengchanlu Station and Lihuanglu Station on Jinan Metro Line 2 passes in close proximity to the pile foundations of an elevated bridge and the Eurasia Electronics Building complex. To ensure the smooth implementation of shield tunneling and the safety of existing struc...

Full description

Bibliographic Details
Published in:Chengshi guidao jiaotong yanjiu
Main Authors: CHONG Jixin, XU Qianwei, HE Xiang, ZHANG Kun, XUE Hairu, LIU Yi
Format: Article
Language:Chinese
Published: Urban Mass Transit Magazine Press 2024-12-01
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.024.html