Structural Design Scheme and Performance Analysis of Urban Rail Transit No.14 Turnout

[Objective] Existing urban rail transit turnouts suffer from low lateral crossing speed, which adversely affects turn-back capacity. To enable 8-car A-type metro trains to achieve a capacity of 30 pairs per hour in the long term, it is necessary to design a turnout structure scheme that can meet hig...

وصف كامل

التفاصيل البيبلوغرافية
الحاوية / القاعدة:Chengshi guidao jiaotong yanjiu
المؤلفون الرئيسيون: FANG Dong, ZHOU Hualong, WANG Xiaotao, ZHOU Changsheng, LIU Yuhang
التنسيق: مقال
اللغة:الصينية
منشور في: Urban Mass Transit Magazine Press 2025-03-01
الموضوعات:
الوصول للمادة أونلاين:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.03.029.html