TESTING OF REINFORCED CONCRETE GIRDERS WITH LENGTH ABOUT 55 M WITH USING INNOVATIVE MEASURING EQUIPMENTS

The results of test of the steel-ferro-concrete span, manufactured according to a specific project at Chekhov Plant of Bridge Constructions (Russia), are presented in the article.

Bibliographic Details
Published in:Nauka ta progres transportu
Main Authors: H. P. Pastushkov, V. H. Pastushkov, V. A. Bilyi, A. A. Yakovlev
Format: Article
Language:English
Published: Ukrainian State University of Science and Technologies 2010-03-01
Subjects:
Online Access:http://stp.diit.edu.ua/article/view/13303/11117