高线步进式加热炉炉底机构结构强度及疲劳寿命分析
The lifting and stepping frame of a furnace at Xiangtan high-speed wire plant,because of its weight and multiple loads,has complex boundary conditions. In the first step,the loads of the furnace’s lifting and stepping frame are simplified,and theoretical analysis and calculation with finite element...
| Published in: | Jixie chuandong |
|---|---|
| Main Authors: | , |
| Format: | Article |
| Language: | Chinese |
| Published: |
Editorial Office of Journal of Mechanical Transmission
2010-01-01
|
| Online Access: | http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2010.07.009 |
