A Case Study of Wind Farm Re-Powering

The Jhongtun wind farm in the area of Penghu Archipelago is studied. The first part of the Jhongtun wind farm has been operated for 19 years, and the second part has been operated for 15 years. It is about time to evaluate the feasibility of this wind farm’s re-powering process to promote its power...

詳細記述

書誌詳細
出版年:Engineering Proceedings
主要な著者: Ming-Hong Chen, Yan-Ting Lin
フォーマット: 論文
言語:英語
出版事項: MDPI AG 2023-11-01
主題:
オンライン・アクセス:https://www.mdpi.com/2673-4591/55/1/11