Optimizing multi-objective scheduling problem of hybrid flow shop with limited buffer
Buffer zones in a production company are set before and after each processing equipment based on various factors such as workshop space in the hybrid-flow workshop, transportation capacity of the carrying equipment, ease of handling of the machine, machine productivity at various stages, and product...
| Published in: | 工程科学学报 |
|---|---|
| Main Authors: | , |
| Format: | Article |
| Language: | Chinese |
| Published: |
Science Press
2021-11-01
|
| Subjects: | |
| Online Access: | http://cje.ustb.edu.cn/article/doi/10.13374/j.issn2095-9389.2020.02.26.002 |
