Optimizing multi-objective scheduling problem of hybrid flow shop with limited buffer

Buffer zones in a production company are set before and after each processing equipment based on various factors such as workshop space in the hybrid-flow workshop, transportation capacity of the carrying equipment, ease of handling of the machine, machine productivity at various stages, and product...

Full description

Bibliographic Details
Published in:工程科学学报
Main Authors: Qing-xin YUAN, Shao-hua DONG
Format: Article
Language:Chinese
Published: Science Press 2021-11-01
Subjects:
Online Access:http://cje.ustb.edu.cn/article/doi/10.13374/j.issn2095-9389.2020.02.26.002