Construction Settlement Monitoring and Control Measures for Mining Method Tunnel Section by Cutting Piles Closely Under-passing Existing Metro Station
Objective When the sectional tunnel closely under-passes the existing metro station by cutting piles, it has a significant impact on the deformation of the upper station. In order to ensure the safety of construction, it is necessary to take effective measures to control the settlement of metro stat...
| Published in: | Chengshi guidao jiaotong yanjiu |
|---|---|
| Main Author: | |
| Format: | Article |
| Language: | Chinese |
| Published: |
Urban Mass Transit Magazine Press
2024-06-01
|
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.06.027.html |
