APA (7th ed.) Citation

Tao, X. (2024, June). Construction Settlement Monitoring and Control Measures for Mining Method Tunnel Section by Cutting Piles Closely Under-passing Existing Metro Station. Chengshi guidao jiaotong yanjiu.

Chicago Style (17th ed.) Citation

Tao, XU. "Construction Settlement Monitoring and Control Measures for Mining Method Tunnel Section by Cutting Piles Closely Under-passing Existing Metro Station." Chengshi Guidao Jiaotong Yanjiu Jun. 2024.

MLA (9th ed.) Citation

Tao, XU. "Construction Settlement Monitoring and Control Measures for Mining Method Tunnel Section by Cutting Piles Closely Under-passing Existing Metro Station." Chengshi Guidao Jiaotong Yanjiu, Jun. 2024.

Warning: These citations may not always be 100% accurate.