Perencanaan Kebutuhan Bahan Baku Keramik BHL244S dan HM-2 dengan Metode Material Requirement Planning
PT. Kuda Laut Mass is a private company which produce floor tile. The problem that usually happen in this company is how to make planning in material requirement especially count the quantity of material and component and also release that will ber educe the production cost.
Main Authors: | Ayudina Puji Estrimaz, Rudy Hendrawanto |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2010-05-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/229 |
Similar Items
-
Penerapan Metode Linier Programming untuk Membuat Perencanaan Produksi yang Optimal
by: Ayudina Puji E, Bagus Asmono
Published: (2010-04-01) -
Perencanaan Pembebanan Kerja Untuk Memenuhi Kebutuhan Konsumen Dengan Metode VAM
by: Ilyas Mas'udin
Published: (2010-04-01) -
Perencanaan Keseimbangan Lintasan Untuk Meningkatkan Efisiensi Kerja Dengan Menggunakan Metode RPW
by: Teguh Baroto, et al.
Published: (2010-04-01) -
Pengoptimalan Tingkat Persediaan Bahan Baku Fire Tube Boiler dengan analisis Markov Chain
by: Murti Astuti, et al.
Published: (2010-04-01) -
Perencanaan Peningkatan Kualitas Jasa Pelayanan Perpustakaan Dengan Metode Rekayasa Nilai
by: Dyah Retno Purwatiningsih
Published: (2010-04-01)