THE COMBINATION OF SELECTED MANAGEMENT INSTRUMENTS TO ANALYZE QUALITY PROBLEMS
The aim of the article is to propose the combination of selected quality management instruments in a sequential and repetitive manner and to identify the incompatibilities and causes of its occurrence. This is a combination of techniques i.e.: brainstorming (BM), causes and effects diagram, multiply...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Publishing House of Rzeszow University of Technology
2021-03-01
|
Series: | Modern Management Review |
Subjects: | |
Online Access: | http://doi.prz.edu.pl/pl/pdf/zim/447 |
id |
doaj-01d7984cef2c4665898af90e4e244af6 |
---|---|
record_format |
Article |
spelling |
doaj-01d7984cef2c4665898af90e4e244af62021-04-01T14:07:38ZengPublishing House of Rzeszow University of TechnologyModern Management Review2300-63662353-07582021-03-01261495810.7862/rz.2021.mmr.05THE COMBINATION OF SELECTED MANAGEMENT INSTRUMENTS TO ANALYZE QUALITY PROBLEMSDominika SIWIEC0https://orcid.org/0000-0002-6663-6621Stanislav VANDŽURAhttps://orcid.org/0000-0003-1850-76111. Rzeszow University of Technology<br style=" font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: 2; text-align: -webkit-auto; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-size-adjust: auto; -webkit-text-stroke-width: 0px; " /> 2. Technical University of KosiceThe aim of the article is to propose the combination of selected quality management instruments in a sequential and repetitive manner and to identify the incompatibilities and causes of its occurrence. This is a combination of techniques i.e.: brainstorming (BM), causes and effects diagram, multiply voting, and the 5Why method. The test of the proposed combination of the selected quality management instruments was made for the problem of the incompatibility of the product in an enterprise located in the Podkarpacie. This problem was the non-metallic inclusions on the bearing housing from CPW 407 steel. The proposed combination of the selected quality management instruments was integrated with the non-destructive testing (NDT). The originality of the study is to propose the combination of selected quality management instruments as a part of a single method, whose stages can occur in a sequential and repetitive manner.http://doi.prz.edu.pl/pl/pdf/zim/447quality, quality management, production engineering, ishikawa diagram, 5why |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Dominika SIWIEC Stanislav VANDŽURA |
spellingShingle |
Dominika SIWIEC Stanislav VANDŽURA THE COMBINATION OF SELECTED MANAGEMENT INSTRUMENTS TO ANALYZE QUALITY PROBLEMS Modern Management Review quality, quality management, production engineering, ishikawa diagram, 5why |
author_facet |
Dominika SIWIEC Stanislav VANDŽURA |
author_sort |
Dominika SIWIEC |
title |
THE COMBINATION OF SELECTED MANAGEMENT INSTRUMENTS TO ANALYZE QUALITY PROBLEMS |
title_short |
THE COMBINATION OF SELECTED MANAGEMENT INSTRUMENTS TO ANALYZE QUALITY PROBLEMS |
title_full |
THE COMBINATION OF SELECTED MANAGEMENT INSTRUMENTS TO ANALYZE QUALITY PROBLEMS |
title_fullStr |
THE COMBINATION OF SELECTED MANAGEMENT INSTRUMENTS TO ANALYZE QUALITY PROBLEMS |
title_full_unstemmed |
THE COMBINATION OF SELECTED MANAGEMENT INSTRUMENTS TO ANALYZE QUALITY PROBLEMS |
title_sort |
combination of selected management instruments to analyze quality problems |
publisher |
Publishing House of Rzeszow University of Technology |
series |
Modern Management Review |
issn |
2300-6366 2353-0758 |
publishDate |
2021-03-01 |
description |
The aim of the article is to propose the combination of selected quality management
instruments in a sequential and repetitive manner and to identify the incompatibilities and
causes of its occurrence. This is a combination of techniques i.e.: brainstorming (BM), causes
and effects diagram, multiply voting, and the 5Why method. The test of the proposed
combination of the selected quality management instruments was made for the problem of the
incompatibility of the product in an enterprise located in the Podkarpacie. This problem was
the non-metallic inclusions on the bearing housing from CPW 407 steel. The proposed
combination of the selected quality management instruments was integrated with the
non-destructive testing (NDT). The originality of the study is to propose the combination
of selected quality management instruments as a part of a single method, whose stages can
occur in a sequential and repetitive manner. |
topic |
quality, quality management, production engineering, ishikawa diagram, 5why |
url |
http://doi.prz.edu.pl/pl/pdf/zim/447 |
work_keys_str_mv |
AT dominikasiwiec thecombinationofselectedmanagementinstrumentstoanalyzequalityproblems AT stanislavvandzura thecombinationofselectedmanagementinstrumentstoanalyzequalityproblems AT dominikasiwiec combinationofselectedmanagementinstrumentstoanalyzequalityproblems AT stanislavvandzura combinationofselectedmanagementinstrumentstoanalyzequalityproblems |
_version_ |
1724175987367739392 |