A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects
Abstract In the early stage of front-end studies of a Mining Project, the global availability (i.e. number of hours a plant is available for production) and production (number of hours a plant is actually operated with material) time of the process plant are normally assumed based on the experience...
Main Authors: | Dennis Travagini Cremonese, Bhaskar Karanth, Giorgio de Tomi |
---|---|
Format: | Article |
Language: | English |
Published: |
Fundação Gorceix
|
Series: | REM: International Engineering Journal |
Subjects: | |
Online Access: | http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2017000200215&lng=en&tlng=en |
Similar Items
-
Economic advantages of dynamic analysis in the early stages of mining projects
by: Dennis Travagini Cremonese, et al. -
Mineral project design using ABC methodology and dynamic simulation.
by: Cremonese, Dennis Travagini
Published: (2019) -
Desenvolvimento e aplicação de metodologia para estudos de simulação dinâmica na cadeia do minério de ferro.
by: Dennis Travagini Cremonese
Published: (2014) -
Desenvolvimento e aplicação de metodologia para estudos de simulação dinâmica na cadeia do minério de ferro.
by: Cremonese, Dennis Travagini
Published: (2014) -
Analysis of the Fire Propagation in a Sublevel Coal Mine
by: Florencio Fernánez-Alaiz, et al.
Published: (2020-07-01)