Delays in the Road Construction Projects from Risk Management Perspective
Delays in the execution stage of road construction projects are one of the significant challenges. The incapability of finishing projects according to schedule has attracted many researchers’ attention to this issue. This study has been formed to investigate delays in road construction projects from...
Main Authors: | Reza Mohajeri Borje Ghaleh, Towhid Pourrostam, Naser Mansour Sharifloo, Javad Majrouhi Sardroud, Ebrahim Safa |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-09-01
|
Series: | Infrastructures |
Subjects: | |
Online Access: | https://www.mdpi.com/2412-3811/6/9/135 |
Similar Items
-
Performance comparison of waste plastic modified versus conventional bituminous roads in Pune city: A case study
by: Arjita Biswas, et al.
Published: (2020-12-01) -
Application of the AHP method to analyze the significance of the factors affecting road traffic safety
by: Justyna SORDYL
Published: (2015-06-01) -
Factors Affecting the Location of Road Emergency Bases in Iran Using Analytical Hierarchy Process (AHP)
by: Mohammad Karim Bahadori, et al.
Published: (2017-10-01) -
Menentukan Prioritas Penanganan Ruas Jalan Nasional di Pulau Bangka
by: Raymond Benardus Munthe, et al.
Published: (2016-06-01) -
An integrated framework for cost- benefit analysis in road safety projects using AHP method
by: Mahsa Mohamadian, et al.
Published: (2011-10-01)