Robust Optimization for Integrated Construction Scheduling and Multiscale Resource Allocation
This research investigates an integrated problem of construction scheduling and resource allocation. Inspired by complex construction practices, multi-time scale resources are considered for different length of terms, such as permanent staff and temporary workers. Differing from the common stochasti...
Main Authors: | Qian Li, Sha Tao, Heap-Yih Chong, Zhijie Sasha Dong |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi-Wiley
2018-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2018/2697985 |
Similar Items
-
Resource allocation in IT projects: using schedule optimization
by: Michael Chilton
Published: (2014-01-01) -
Optimization of Task Scheduling and Resource Allocation on Cloud Environment
by: Jia-cen Fang, et al.
Published: (2012) -
Optimal Renewable Resource Allocation and Load Scheduling of Resilient Communities
by: Jing Wang, et al.
Published: (2020-10-01) -
Resource Allocation and Outpatient Appointment Scheduling Using Simulation Optimization
by: Carrie Ka Yuk Lin, et al.
Published: (2017-01-01) -
The Resource-Constrained Project Scheduling Problems with Resource Allocation and Scheduling
by: Shou-Chih Chu, et al.