Corrosion Behavior and Failure Mechanism of Prestressed Rock Bolts (Cables) in the Underground Coal Mine
Premature failure of rock bolts (cables) due to stress corrosion cracking (SCC) is a phenomenon that has been reported to occur in the underground environment. In the 1990s, many failure accidents of bolts which occurred in the United Kingdom were caused by SCC [1]. In this study, the corrosion beha...
Main Authors: | Qiong Wang, Fengnian Wang, Aiwu Ren, Rui Peng, Jian Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/6686865 |
Similar Items
-
Microbiologically influenced corrosion of cable bolts in underground coal mines: The effect of Acidithiobacillus ferrooxidans
by: H. Chen, et al.
Published: (2021-05-01) -
DESIGN METHODS FOR ROCK BOLTS USING IN-SITU MEASUREMENT FROM UNDERGROUND COAL MINES
by: Kostecki, Todd
Published: (2019) -
STRESS CORROSION CRACKING OF REBAR ROOF BOLTS IN U.S. UNDERGROUND COAL MINES - A PRELIMINARY STUDY
by: Bylapudi, Gopi
Published: (2014) -
Rock bolt reinforcement systems for coal mine roadways
by: Tully, David Michael
Published: (1987) -
Analysis of the influence of groundwater and the stress regime on bolt behaviour in underground coal mines
by: Jack A. Smith, et al.
Published: (2019-04-01)