Groundwater Inrush Control and Parameters Optimization of Curtain Grouting Reinforcement for the Jingzhai Tunnel
Based on the systematic study on the characteristics of water and mud inrush during the excavation of Jingzhai tunnel, the mechanism of water inrush seepage transformation caused by excavation disturbance is analyzed. By means of electromagnetic geophysical prospecting, the potential water bearing a...
Main Authors: | Gan Li, Weibin Ma, Siming Tian, Zhou Hongbo, Fan Huabin, Wenhao Zou |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi-Wiley
2021-01-01
|
Series: | Geofluids |
Online Access: | http://dx.doi.org/10.1155/2021/6634513 |
Similar Items
-
Parameters Optimization of Curtain Grouting Reinforcement Cycle in Yonglian Tunnel and Its Application
by: Qingsong Zhang, et al.
Published: (2015-01-01) -
Optimizing the Grouting Design for Groundwater Inrush Control in Completely Weathered Granite Tunnel: An Experimental and Field Investigation
by: Weihua Zheng, et al.
Published: (2019-07-01) -
Protection against water or mud inrush in tunnels by grouting: A review
by: Shucai Li, et al.
Published: (2016-10-01) -
A Study of Deformation Behavior of Forepoling Curtain Grouting in Tunnelling
by: Chao-Hui Su, et al.
Published: (2006) -
Mechanics Parameter Optimization and Evaluation of Curtain Grouting Material in Deep, Water-Rich Karst Tunnels
by: Hai Shi, et al.
Published: (2017-01-01)