Transient flows in a wellbore during killing of an empty well
Failure to adequately equipping the wellhead with appropriate well control equipment may result in a high pressure in the gas drilling when it reaches a high-yield gas layer. This would require the execution of a well killing operation to facilitate follow-up drilling and well completion. A...
Main Authors: | Jiang Lin, Wei Na, Liu An-Qi, Meng Ying-Feng, Li Hai-Tao, Sun Wan-Tong, Zheng Li-Jun, Fu Qiang, Pang Wei-Xin |
---|---|
Format: | Article |
Language: | English |
Published: |
VINCA Institute of Nuclear Sciences
2019-01-01
|
Series: | Thermal Science |
Subjects: | |
Online Access: | http://www.doiserbia.nb.rs/img/doi/0354-9836/2019/0354-98361904297J.pdf |
Similar Items
-
Change mechanism of transient gas-liquid two-phase flow in wellbore during marine natural gas hydrate reservoir drilling
by: Wei Na, et al.
Published: (2019-01-01) -
Development of a Well Intervention Toolkit to Analyze Initial Wellbore Conditions and Evaluate Injection Pressures, Flow Path, Well Kill, and Plugging Procedures
by: Paknejad, Amir S
Published: (2013) -
A Deliverability Method for Estimating Stabilized Gas Well Performance during Transient Periods on Unconventional Reservoir
by: Amega Yasutra, et al.
Published: (2021-03-01) -
Well Killing Technology before Workover Operation in Complicated Conditions
by: Dmitry V. Mardashov, et al.
Published: (2021-01-01) -
Transient two-phase flow behavior in wellbores and well control analysis for sour gas kick with high H2S content
by: Liangbin Dou, et al.
Published: (2021-01-01)