Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River

There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project (HPP) in the lower reaches of the Congo River. Based on topographic and hydrological data of the basin, the exploitation plan for the lower reaches of the Congo River is herein studied. Th...

Full description

Bibliographic Details
Main Authors: Chuanyu Deng, Fulong Song, Zhengxi Chen
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2020-02-01
Series:Global Energy Interconnection
Online Access:http://www.sciencedirect.com/science/article/pii/S209651172030030X
id doaj-1294977237274b4488a24e5b9c2fafc2
record_format Article
spelling doaj-1294977237274b4488a24e5b9c2fafc22021-03-02T07:24:56ZengKeAi Communications Co., Ltd.Global Energy Interconnection2096-51172020-02-01311222Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo RiverChuanyu Deng0Fulong Song1Zhengxi Chen2Global Energy Interconnection Development and Cooperation Organization, No. 8 Xuanwumennei Street, Beijing 100031, P.R. China; PowerChina Chengdu Engineering Corporation Limited, No. 1 Huanhuabei Street, Chengdu 610072, P.R. China; Corresponding author.Global Energy Interconnection Development and Cooperation Organization, No. 8 Xuanwumennei Street, Beijing 100031, P.R. ChinaGlobal Energy Interconnection Development and Cooperation Organization, No. 8 Xuanwumennei Street, Beijing 100031, P.R. ChinaThere have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project (HPP) in the lower reaches of the Congo River. Based on topographic and hydrological data of the basin, the exploitation plan for the lower reaches of the Congo River is herein studied. The preliminary proposal involves exploitation using three- cascade hydropower stations. The Grand Inga HPP is the core of the mega hydropower base. The full supply level (FSL) of the reservoir, installed capacity, and regulation performance of the Grand Inga HPP are studied in detail. The main advantages and disadvantages of the high and low dam schemes of the Grand Inga Hydropower Project are compared, in addition to their effects on the overall development of the hydropower base. Moreover, the installed capacity is optimized based on the load characteristics. Based on simulation of cascade hydropower operation and comprehensive analysis, the project scale and implementation sequence is proposed. The influence of hydropower on socio-economic development, energy supply, and emission reduction is analyzed. Finally, the optimal exploitation scheme of the mega hydropower base for the lower reaches of the Congo River is proposed. Keywords: Congo River, Cascade hydropower exploitation plan, Grand Inga hydropower project, Mega hydropower base, Scheme optimizationhttp://www.sciencedirect.com/science/article/pii/S209651172030030X
collection DOAJ
language English
format Article
sources DOAJ
author Chuanyu Deng
Fulong Song
Zhengxi Chen
spellingShingle Chuanyu Deng
Fulong Song
Zhengxi Chen
Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River
Global Energy Interconnection
author_facet Chuanyu Deng
Fulong Song
Zhengxi Chen
author_sort Chuanyu Deng
title Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River
title_short Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River
title_full Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River
title_fullStr Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River
title_full_unstemmed Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River
title_sort preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of congo river
publisher KeAi Communications Co., Ltd.
series Global Energy Interconnection
issn 2096-5117
publishDate 2020-02-01
description There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project (HPP) in the lower reaches of the Congo River. Based on topographic and hydrological data of the basin, the exploitation plan for the lower reaches of the Congo River is herein studied. The preliminary proposal involves exploitation using three- cascade hydropower stations. The Grand Inga HPP is the core of the mega hydropower base. The full supply level (FSL) of the reservoir, installed capacity, and regulation performance of the Grand Inga HPP are studied in detail. The main advantages and disadvantages of the high and low dam schemes of the Grand Inga Hydropower Project are compared, in addition to their effects on the overall development of the hydropower base. Moreover, the installed capacity is optimized based on the load characteristics. Based on simulation of cascade hydropower operation and comprehensive analysis, the project scale and implementation sequence is proposed. The influence of hydropower on socio-economic development, energy supply, and emission reduction is analyzed. Finally, the optimal exploitation scheme of the mega hydropower base for the lower reaches of the Congo River is proposed. Keywords: Congo River, Cascade hydropower exploitation plan, Grand Inga hydropower project, Mega hydropower base, Scheme optimization
url http://www.sciencedirect.com/science/article/pii/S209651172030030X
work_keys_str_mv AT chuanyudeng preliminarystudyontheexploitationplanofthemegahydropowerbaseinthelowerreachesofcongoriver
AT fulongsong preliminarystudyontheexploitationplanofthemegahydropowerbaseinthelowerreachesofcongoriver
AT zhengxichen preliminarystudyontheexploitationplanofthemegahydropowerbaseinthelowerreachesofcongoriver
_version_ 1724241370806222848