Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River
There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project (HPP) in the lower reaches of the Congo River. Based on topographic and hydrological data of the basin, the exploitation plan for the lower reaches of the Congo River is herein studied. Th...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2020-02-01
|
Series: | Global Energy Interconnection |
Online Access: | http://www.sciencedirect.com/science/article/pii/S209651172030030X |
id |
doaj-1294977237274b4488a24e5b9c2fafc2 |
---|---|
record_format |
Article |
spelling |
doaj-1294977237274b4488a24e5b9c2fafc22021-03-02T07:24:56ZengKeAi Communications Co., Ltd.Global Energy Interconnection2096-51172020-02-01311222Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo RiverChuanyu Deng0Fulong Song1Zhengxi Chen2Global Energy Interconnection Development and Cooperation Organization, No. 8 Xuanwumennei Street, Beijing 100031, P.R. China; PowerChina Chengdu Engineering Corporation Limited, No. 1 Huanhuabei Street, Chengdu 610072, P.R. China; Corresponding author.Global Energy Interconnection Development and Cooperation Organization, No. 8 Xuanwumennei Street, Beijing 100031, P.R. ChinaGlobal Energy Interconnection Development and Cooperation Organization, No. 8 Xuanwumennei Street, Beijing 100031, P.R. ChinaThere have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project (HPP) in the lower reaches of the Congo River. Based on topographic and hydrological data of the basin, the exploitation plan for the lower reaches of the Congo River is herein studied. The preliminary proposal involves exploitation using three- cascade hydropower stations. The Grand Inga HPP is the core of the mega hydropower base. The full supply level (FSL) of the reservoir, installed capacity, and regulation performance of the Grand Inga HPP are studied in detail. The main advantages and disadvantages of the high and low dam schemes of the Grand Inga Hydropower Project are compared, in addition to their effects on the overall development of the hydropower base. Moreover, the installed capacity is optimized based on the load characteristics. Based on simulation of cascade hydropower operation and comprehensive analysis, the project scale and implementation sequence is proposed. The influence of hydropower on socio-economic development, energy supply, and emission reduction is analyzed. Finally, the optimal exploitation scheme of the mega hydropower base for the lower reaches of the Congo River is proposed. Keywords: Congo River, Cascade hydropower exploitation plan, Grand Inga hydropower project, Mega hydropower base, Scheme optimizationhttp://www.sciencedirect.com/science/article/pii/S209651172030030X |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Chuanyu Deng Fulong Song Zhengxi Chen |
spellingShingle |
Chuanyu Deng Fulong Song Zhengxi Chen Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River Global Energy Interconnection |
author_facet |
Chuanyu Deng Fulong Song Zhengxi Chen |
author_sort |
Chuanyu Deng |
title |
Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River |
title_short |
Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River |
title_full |
Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River |
title_fullStr |
Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River |
title_full_unstemmed |
Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River |
title_sort |
preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of congo river |
publisher |
KeAi Communications Co., Ltd. |
series |
Global Energy Interconnection |
issn |
2096-5117 |
publishDate |
2020-02-01 |
description |
There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project (HPP) in the lower reaches of the Congo River. Based on topographic and hydrological data of the basin, the exploitation plan for the lower reaches of the Congo River is herein studied. The preliminary proposal involves exploitation using three- cascade hydropower stations. The Grand Inga HPP is the core of the mega hydropower base. The full supply level (FSL) of the reservoir, installed capacity, and regulation performance of the Grand Inga HPP are studied in detail. The main advantages and disadvantages of the high and low dam schemes of the Grand Inga Hydropower Project are compared, in addition to their effects on the overall development of the hydropower base. Moreover, the installed capacity is optimized based on the load characteristics. Based on simulation of cascade hydropower operation and comprehensive analysis, the project scale and implementation sequence is proposed. The influence of hydropower on socio-economic development, energy supply, and emission reduction is analyzed. Finally, the optimal exploitation scheme of the mega hydropower base for the lower reaches of the Congo River is proposed. Keywords: Congo River, Cascade hydropower exploitation plan, Grand Inga hydropower project, Mega hydropower base, Scheme optimization |
url |
http://www.sciencedirect.com/science/article/pii/S209651172030030X |
work_keys_str_mv |
AT chuanyudeng preliminarystudyontheexploitationplanofthemegahydropowerbaseinthelowerreachesofcongoriver AT fulongsong preliminarystudyontheexploitationplanofthemegahydropowerbaseinthelowerreachesofcongoriver AT zhengxichen preliminarystudyontheexploitationplanofthemegahydropowerbaseinthelowerreachesofcongoriver |
_version_ |
1724241370806222848 |