Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River

There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project (HPP) in the lower reaches of the Congo River. Based on topographic and hydrological data of the basin, the exploitation plan for the lower reaches of the Congo River is herein studied. Th...

Full description

Bibliographic Details
Main Authors: Chuanyu Deng, Fulong Song, Zhengxi Chen
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2020-02-01
Series:Global Energy Interconnection
Online Access:http://www.sciencedirect.com/science/article/pii/S209651172030030X