Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River
There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project (HPP) in the lower reaches of the Congo River. Based on topographic and hydrological data of the basin, the exploitation plan for the lower reaches of the Congo River is herein studied. Th...
Main Authors: | Chuanyu Deng, Fulong Song, Zhengxi Chen |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2020-02-01
|
Series: | Global Energy Interconnection |
Online Access: | http://www.sciencedirect.com/science/article/pii/S209651172030030X |
Similar Items
-
Runoff and Sediment Response to Cascade Hydropower Exploitation in the Middle and Lower Han River, China
by: Junhong Zhang, et al.
Published: (2017-01-01) -
The history of the lower Congo River tribes of the Belgian Congo
by: Benner, Phyllis Louise
Published: (2014) -
Impact analysis of small hydropower construction on river connectivity on the upper reaches of the great rivers in the Tibetan Plateau
by: Dongchuan Wang, et al.
Published: (2021-04-01) -
Conductor selection and economic analysis of D.R. congo–guinea ±800 kV UHVDC transmission project
by: Zhengxi Chen, et al.
Published: (2020-08-01) -
Have the “mega-journals” reached the limits to growth?
by: Bo-Christer Björk
Published: (2015-05-01)