Monitoring the Accuracy of Measurements the Load of Industrial Enterprises

The normalized accuracy of the installed measuring instruments determines the scheduled measurement accuracy of the daily active load of an industrial enterprise. To maintain  it during operation, syntactic and semantic methods can be used to control the reliability of load measurements. During synt...

Full description

Bibliographic Details
Main Authors: V. A. Anishchenko, T. V. Pisaruk
Format: Article
Language:Russian
Published: Belarusian National Technical University 2020-10-01
Series:Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
Subjects:
Online Access:https://energy.bntu.by/jour/article/view/1991
id doaj-151fa2e0486b4ca29187c81ab095170d
record_format Article
spelling doaj-151fa2e0486b4ca29187c81ab095170d2021-07-29T08:45:41ZrusBelarusian National Technical UniversityIzvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika1029-74482414-03412020-10-0163539341010.21122/1029-7448-2020-63-5-393-4101727Monitoring the Accuracy of Measurements the Load of Industrial EnterprisesV. A. Anishchenko0T. V. Pisaruk1Belarusian National Technical UniversityBelarusian National Technical UniversityThe normalized accuracy of the installed measuring instruments determines the scheduled measurement accuracy of the daily active load of an industrial enterprise. To maintain  it during operation, syntactic and semantic methods can be used to control the reliability of load measurements. During syntactic control, the state of measuring instruments that collect and process information about the enterprise’s load is diagnosed. Semantic control is based on the use of probabilistic characteristics of the measured load. The condition necessary for semantic control is the presence of information redundancy about the values of the monitored load. It is possible to control the load limit values (settings) when a priori information is known about the lower and upper limits in which reliably measured load values in normal operation of the enterprise may be contained. The article considers control methods that use a posteriori redundant information about the dynamics of load alterations in various sections of the daily schedule. These methods include monitoring by the first increments of the load, which characterize the speed of its alterations, as well as control using linear and nonlinear extrapolations of the first increments.  The results of the analysis of probabilistic characteristics of the daily active load of the enterprise and its first increments, which characterize the rate of load change, are presented. The effect of probabilistic characteristics of the first load increments on the boundaries of making a decision about the reliability of measurements is demonstrated. A comparative analysis of the effectiveness of reliability control methods based on the first load increments and their extrapolated values  has been carried out on the example of measurements of daily active load schedules of the “Minsk Motor Plant” JSC.https://energy.bntu.by/jour/article/view/1991load of an industrial enterprisefirst increments of loadprobabilistic characteristics of loadinformation redundancycontrol of measurement reliability
collection DOAJ
language Russian
format Article
sources DOAJ
author V. A. Anishchenko
T. V. Pisaruk
spellingShingle V. A. Anishchenko
T. V. Pisaruk
Monitoring the Accuracy of Measurements the Load of Industrial Enterprises
Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
load of an industrial enterprise
first increments of load
probabilistic characteristics of load
information redundancy
control of measurement reliability
author_facet V. A. Anishchenko
T. V. Pisaruk
author_sort V. A. Anishchenko
title Monitoring the Accuracy of Measurements the Load of Industrial Enterprises
title_short Monitoring the Accuracy of Measurements the Load of Industrial Enterprises
title_full Monitoring the Accuracy of Measurements the Load of Industrial Enterprises
title_fullStr Monitoring the Accuracy of Measurements the Load of Industrial Enterprises
title_full_unstemmed Monitoring the Accuracy of Measurements the Load of Industrial Enterprises
title_sort monitoring the accuracy of measurements the load of industrial enterprises
publisher Belarusian National Technical University
series Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
issn 1029-7448
2414-0341
publishDate 2020-10-01
description The normalized accuracy of the installed measuring instruments determines the scheduled measurement accuracy of the daily active load of an industrial enterprise. To maintain  it during operation, syntactic and semantic methods can be used to control the reliability of load measurements. During syntactic control, the state of measuring instruments that collect and process information about the enterprise’s load is diagnosed. Semantic control is based on the use of probabilistic characteristics of the measured load. The condition necessary for semantic control is the presence of information redundancy about the values of the monitored load. It is possible to control the load limit values (settings) when a priori information is known about the lower and upper limits in which reliably measured load values in normal operation of the enterprise may be contained. The article considers control methods that use a posteriori redundant information about the dynamics of load alterations in various sections of the daily schedule. These methods include monitoring by the first increments of the load, which characterize the speed of its alterations, as well as control using linear and nonlinear extrapolations of the first increments.  The results of the analysis of probabilistic characteristics of the daily active load of the enterprise and its first increments, which characterize the rate of load change, are presented. The effect of probabilistic characteristics of the first load increments on the boundaries of making a decision about the reliability of measurements is demonstrated. A comparative analysis of the effectiveness of reliability control methods based on the first load increments and their extrapolated values  has been carried out on the example of measurements of daily active load schedules of the “Minsk Motor Plant” JSC.
topic load of an industrial enterprise
first increments of load
probabilistic characteristics of load
information redundancy
control of measurement reliability
url https://energy.bntu.by/jour/article/view/1991
work_keys_str_mv AT vaanishchenko monitoringtheaccuracyofmeasurementstheloadofindustrialenterprises
AT tvpisaruk monitoringtheaccuracyofmeasurementstheloadofindustrialenterprises
_version_ 1724163085798735872