Household Willingness to Pay for Wastewater Treatment and Water Supply System Improvement in a Ger Area in Ulaanbaatar City, Mongolia

This study aimed to investigate the willingness of residents of ger (traditional nomadic house) areas to pay for improvements in the water supply and wastewater treatment system in terms of capital costs and operation and management (O&M) costs by contingent valuation (CV) method and payment...

Full description

Bibliographic Details
Main Authors: Ariuntuya Byambadorj, Han Soo Lee
Format: Article
Language:English
Published: MDPI AG 2019-09-01
Series:Water
Subjects:
Online Access:https://www.mdpi.com/2073-4441/11/9/1856
id doaj-17a5ce2e1e724b7cb108eac090f6b071
record_format Article
spelling doaj-17a5ce2e1e724b7cb108eac090f6b0712020-11-24T20:52:50ZengMDPI AGWater2073-44412019-09-01119185610.3390/w11091856w11091856Household Willingness to Pay for Wastewater Treatment and Water Supply System Improvement in a Ger Area in Ulaanbaatar City, MongoliaAriuntuya Byambadorj0Han Soo Lee1Graduate School for International Development and Cooperation, Hiroshima University, 1-5-1 Kagamiyama, Higashi-Hiroshima, Hiroshima 739-8529, JapanGraduate School for International Development and Cooperation, Hiroshima University, 1-5-1 Kagamiyama, Higashi-Hiroshima, Hiroshima 739-8529, JapanThis study aimed to investigate the willingness of residents of ger (traditional nomadic house) areas to pay for improvements in the water supply and wastewater treatment system in terms of capital costs and operation and management (O&M) costs by contingent valuation (CV) method and payment card format. The problems in the ger area are a lack of a drainage system, the use of unimproved sanitation technology, and an unsafe water supply, in addition to the direct discharging of wastewater into pit latrines, soak pits, yards, and streets. The contribution of this study is the application of this method in a previously unstudied area to enhance the participation of ger communities that are absent in the development plan of Ulaanbaatar city. A field survey was conducted in one of the ger areas, the Damba planning unit, and 298 samples were collected from residents. Data were analyzed and compared using ordinary least squares (OLS) and Tobit regression models. Model results showed that the average total willingness to pay for the water supply and wastewater treatment facility installation was 1000 thousand Mongolian tugrik (MNT), and the average total willingness to pay for the operation and management costs was a maximum of 3000 MNT per month. The important factors affecting the residents’ willingness to pay (WTP) for installation were the housing type, current monthly payment for water supply, income level, and education, in order of significance. People living in their own detached house and educated greater than high school were more willing to pay for the installation of water supply and wastewater treatment facilities. Those who were paying higher for their monthly water supply were more willing to pay for the installation cost. With respect to the WTP for O&M cost, the WTP was associated with the family size, income level, housing, time for water access, and education, in order of significance. Families a larger number of members were more willing to pay, and low-income people were less willing to pay for O&M. Education showed a positive influence on the WTP for O&M. Water access time also affected the WTP of those who could not access water within 30 min, as they indicated low WTP values.https://www.mdpi.com/2073-4441/11/9/1856wastewater treatmentwater supplycontingent valuation methodTobit modelDamba district
collection DOAJ
language English
format Article
sources DOAJ
author Ariuntuya Byambadorj
Han Soo Lee
spellingShingle Ariuntuya Byambadorj
Han Soo Lee
Household Willingness to Pay for Wastewater Treatment and Water Supply System Improvement in a Ger Area in Ulaanbaatar City, Mongolia
Water
wastewater treatment
water supply
contingent valuation method
Tobit model
Damba district
author_facet Ariuntuya Byambadorj
Han Soo Lee
author_sort Ariuntuya Byambadorj
title Household Willingness to Pay for Wastewater Treatment and Water Supply System Improvement in a Ger Area in Ulaanbaatar City, Mongolia
title_short Household Willingness to Pay for Wastewater Treatment and Water Supply System Improvement in a Ger Area in Ulaanbaatar City, Mongolia
title_full Household Willingness to Pay for Wastewater Treatment and Water Supply System Improvement in a Ger Area in Ulaanbaatar City, Mongolia
title_fullStr Household Willingness to Pay for Wastewater Treatment and Water Supply System Improvement in a Ger Area in Ulaanbaatar City, Mongolia
title_full_unstemmed Household Willingness to Pay for Wastewater Treatment and Water Supply System Improvement in a Ger Area in Ulaanbaatar City, Mongolia
title_sort household willingness to pay for wastewater treatment and water supply system improvement in a ger area in ulaanbaatar city, mongolia
publisher MDPI AG
series Water
issn 2073-4441
publishDate 2019-09-01
description This study aimed to investigate the willingness of residents of ger (traditional nomadic house) areas to pay for improvements in the water supply and wastewater treatment system in terms of capital costs and operation and management (O&M) costs by contingent valuation (CV) method and payment card format. The problems in the ger area are a lack of a drainage system, the use of unimproved sanitation technology, and an unsafe water supply, in addition to the direct discharging of wastewater into pit latrines, soak pits, yards, and streets. The contribution of this study is the application of this method in a previously unstudied area to enhance the participation of ger communities that are absent in the development plan of Ulaanbaatar city. A field survey was conducted in one of the ger areas, the Damba planning unit, and 298 samples were collected from residents. Data were analyzed and compared using ordinary least squares (OLS) and Tobit regression models. Model results showed that the average total willingness to pay for the water supply and wastewater treatment facility installation was 1000 thousand Mongolian tugrik (MNT), and the average total willingness to pay for the operation and management costs was a maximum of 3000 MNT per month. The important factors affecting the residents’ willingness to pay (WTP) for installation were the housing type, current monthly payment for water supply, income level, and education, in order of significance. People living in their own detached house and educated greater than high school were more willing to pay for the installation of water supply and wastewater treatment facilities. Those who were paying higher for their monthly water supply were more willing to pay for the installation cost. With respect to the WTP for O&M cost, the WTP was associated with the family size, income level, housing, time for water access, and education, in order of significance. Families a larger number of members were more willing to pay, and low-income people were less willing to pay for O&M. Education showed a positive influence on the WTP for O&M. Water access time also affected the WTP of those who could not access water within 30 min, as they indicated low WTP values.
topic wastewater treatment
water supply
contingent valuation method
Tobit model
Damba district
url https://www.mdpi.com/2073-4441/11/9/1856
work_keys_str_mv AT ariuntuyabyambadorj householdwillingnesstopayforwastewatertreatmentandwatersupplysystemimprovementinagerareainulaanbaatarcitymongolia
AT hansoolee householdwillingnesstopayforwastewatertreatmentandwatersupplysystemimprovementinagerareainulaanbaatarcitymongolia
_version_ 1716798876471525376