EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA

Section Internal Logistic PT. TMMIN has the task of supplying small parts from various suppliers to each post lane assembly. Time process used today is known as Gentan-i. Gentan-i has a shortage that tolerance time for man power is not calculated objectively, but overall between each process, so the...

Full description

Bibliographic Details
Main Authors: Dene Herwanto, Rianita Puspa Sari
Format: Article
Language:Indonesian
Published: Universitas Muhammadiyah Jakarta 2018-01-01
Series:Jurnal Teknologi
Subjects:
Online Access:https://jurnal.umj.ac.id/index.php/jurtek/article/view/1148
id doaj-19bff9f4946c49a9bd120fddd05c4051
record_format Article
spelling doaj-19bff9f4946c49a9bd120fddd05c40512020-11-24T23:50:13ZindUniversitas Muhammadiyah JakartaJurnal Teknologi2085-16692460-02882018-01-0110191810.24853/jurtek.10.1.9-181307EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIADene Herwanto0Rianita Puspa Sari1Universitas Singaperbangsa KarawangUniversitas Singaperbangsa KarawangSection Internal Logistic PT. TMMIN has the task of supplying small parts from various suppliers to each post lane assembly. Time process used today is known as Gentan-i. Gentan-i has a shortage that tolerance time for man power is not calculated objectively, but overall between each process, so the workload of supply small part process route A is seemed so heavy and operator to work in hurry. This study aimed to evaluate the processing time of supply small part by taking into account the workload, so as to obtain better standard time for the operator. The study was conducted by means of direct observation of the working process of small parts supply by operator then retrieved the data processing time by stopwatch. The calculations show that the operator workload with Gentan-i time is higher than the workload with the standard time that takes into account the performance rating and allowance. One of the improvements to be proposed is to balance some tasks of route A supply to the other route so that the overall workload becomes more balanced.https://jurnal.umj.ac.id/index.php/jurtek/article/view/1148pengiriman part, Gentan-i, waktu baku, efisiensi
collection DOAJ
language Indonesian
format Article
sources DOAJ
author Dene Herwanto
Rianita Puspa Sari
spellingShingle Dene Herwanto
Rianita Puspa Sari
EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA
Jurnal Teknologi
pengiriman part, Gentan-i, waktu baku, efisiensi
author_facet Dene Herwanto
Rianita Puspa Sari
author_sort Dene Herwanto
title EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA
title_short EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA
title_full EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA
title_fullStr EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA
title_full_unstemmed EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA
title_sort evaluasi waktu proses supply small part dengan memperhatikan beban kerja di pt. toyota motor manufacturing indonesia
publisher Universitas Muhammadiyah Jakarta
series Jurnal Teknologi
issn 2085-1669
2460-0288
publishDate 2018-01-01
description Section Internal Logistic PT. TMMIN has the task of supplying small parts from various suppliers to each post lane assembly. Time process used today is known as Gentan-i. Gentan-i has a shortage that tolerance time for man power is not calculated objectively, but overall between each process, so the workload of supply small part process route A is seemed so heavy and operator to work in hurry. This study aimed to evaluate the processing time of supply small part by taking into account the workload, so as to obtain better standard time for the operator. The study was conducted by means of direct observation of the working process of small parts supply by operator then retrieved the data processing time by stopwatch. The calculations show that the operator workload with Gentan-i time is higher than the workload with the standard time that takes into account the performance rating and allowance. One of the improvements to be proposed is to balance some tasks of route A supply to the other route so that the overall workload becomes more balanced.
topic pengiriman part, Gentan-i, waktu baku, efisiensi
url https://jurnal.umj.ac.id/index.php/jurtek/article/view/1148
work_keys_str_mv AT deneherwanto evaluasiwaktuprosessupplysmallpartdenganmemperhatikanbebankerjadipttoyotamotormanufacturingindonesia
AT rianitapuspasari evaluasiwaktuprosessupplysmallpartdenganmemperhatikanbebankerjadipttoyotamotormanufacturingindonesia
_version_ 1725479538338562048