Scheduling Flexible Manufacturing System with Stacker Crane Using Coloured Petri Nets
Scheduling Flexible Manufacturing System (FMS) can increase production speed and accuracy. It because FMS has an ability to process various variety of product at same work station. However, FMS need efficient allocation of resources, for example: allocation of material handling equipment. This paper...
Main Authors: | Ari Setiawan, Teguh Ersada Natail Sitepu |
---|---|
Format: | Article |
Language: | English |
Published: |
Petra Christian University
2019-01-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://jurnalindustri.petra.ac.id/index.php/ind/article/view/20798 |
Similar Items
-
Reducing the mast vibration of single-mast stacker cranes by gain-scheduled control
by: Hajdu Sándor, et al.
Published: (2016-12-01) -
Energy regeneration in automated high bay warehouse with stacker cranes
by: Boris Jerman, et al.
Published: (2017-01-01) -
Periodic Topology Optimization of a Stacker Crane
by: Hong-Yu Jiao, et al.
Published: (2019-01-01) -
An investigation of mean energy demand, performance and reference cycles for stacker cranes
by: Rücker Andreas, et al.
Published: (2020-01-01) -
Development of a method for the energy efficiency determination of stacker cranes in automated high-bay warehouses
by: Rücker Andreas, et al.
Published: (2020-01-01)