Settlement characteristics of major infrastructures in Shanghai
Critical infrastructures in Shanghai have undergone uneven settlement since their operation, which plays an important role in affecting the security of Shanghai. This paper, taking rail transportation as example, investigates settlement characteristics and influencing factors of this linear engi...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Copernicus Publications
2015-11-01
|
Series: | Proceedings of the International Association of Hydrological Sciences |
Online Access: | https://www.proc-iahs.net/372/475/2015/piahs-372-475-2015.pdf |
id |
doaj-1d1d676c51ee4b1ba6277dacdc1f78f4 |
---|---|
record_format |
Article |
spelling |
doaj-1d1d676c51ee4b1ba6277dacdc1f78f42020-11-24T20:57:43ZengCopernicus PublicationsProceedings of the International Association of Hydrological Sciences2199-89812199-899X2015-11-0137247547910.5194/piahs-372-475-2015Settlement characteristics of major infrastructures in ShanghaiX. Jiao0X. Jiao1X. X. Yan2X. X. Yan3H. M. Wang4H. M. Wang5Shanghai Institute of Geological Survey, Shanghai, ChinaKey Laboratory of Land Subsidence Monitoring and Prevention, Ministry of Land and Resources of China, Shanghai, ChinaShanghai Institute of Geological Survey, Shanghai, ChinaKey Laboratory of Land Subsidence Monitoring and Prevention, Ministry of Land and Resources of China, Shanghai, ChinaShanghai Institute of Geological Survey, Shanghai, ChinaKey Laboratory of Land Subsidence Monitoring and Prevention, Ministry of Land and Resources of China, Shanghai, ChinaCritical infrastructures in Shanghai have undergone uneven settlement since their operation, which plays an important role in affecting the security of Shanghai. This paper, taking rail transportation as example, investigates settlement characteristics and influencing factors of this linear engineering, based on long-term settlement monitoring data. Results show that rail settlement is related to geological conditions, regional ground subsidence, surrounding construction activities and structural differences in the rail systems. In order to effectively decrease the impact of regional ground subsidence, a monitoring and early-warning mechanism for critical infrastructure is established by the administrative department and engineering operators, including monitoring network construction, settlement monitoring, information sharing, settlement warning, and so on.https://www.proc-iahs.net/372/475/2015/piahs-372-475-2015.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
X. Jiao X. Jiao X. X. Yan X. X. Yan H. M. Wang H. M. Wang |
spellingShingle |
X. Jiao X. Jiao X. X. Yan X. X. Yan H. M. Wang H. M. Wang Settlement characteristics of major infrastructures in Shanghai Proceedings of the International Association of Hydrological Sciences |
author_facet |
X. Jiao X. Jiao X. X. Yan X. X. Yan H. M. Wang H. M. Wang |
author_sort |
X. Jiao |
title |
Settlement characteristics of major infrastructures in Shanghai |
title_short |
Settlement characteristics of major infrastructures in Shanghai |
title_full |
Settlement characteristics of major infrastructures in Shanghai |
title_fullStr |
Settlement characteristics of major infrastructures in Shanghai |
title_full_unstemmed |
Settlement characteristics of major infrastructures in Shanghai |
title_sort |
settlement characteristics of major infrastructures in shanghai |
publisher |
Copernicus Publications |
series |
Proceedings of the International Association of Hydrological Sciences |
issn |
2199-8981 2199-899X |
publishDate |
2015-11-01 |
description |
Critical infrastructures in Shanghai have undergone uneven settlement since
their operation, which plays an important role in affecting the security of
Shanghai. This paper, taking rail transportation as example, investigates
settlement characteristics and influencing factors of this linear
engineering, based on long-term settlement monitoring data. Results show
that rail settlement is related to geological conditions, regional ground
subsidence, surrounding construction activities and structural differences
in the rail systems. In order to effectively decrease the impact of regional
ground subsidence, a monitoring and early-warning mechanism for critical
infrastructure is established by the administrative department and
engineering operators, including monitoring network construction, settlement
monitoring, information sharing, settlement warning, and so on. |
url |
https://www.proc-iahs.net/372/475/2015/piahs-372-475-2015.pdf |
work_keys_str_mv |
AT xjiao settlementcharacteristicsofmajorinfrastructuresinshanghai AT xjiao settlementcharacteristicsofmajorinfrastructuresinshanghai AT xxyan settlementcharacteristicsofmajorinfrastructuresinshanghai AT xxyan settlementcharacteristicsofmajorinfrastructuresinshanghai AT hmwang settlementcharacteristicsofmajorinfrastructuresinshanghai AT hmwang settlementcharacteristicsofmajorinfrastructuresinshanghai |
_version_ |
1716787777675198464 |