Capacity Enhancement and Voltage Stability Improvement of Power Transmission Line by Series Compensation
To install a new infrastructure of a power transmission line is not only costly but also time-consuming, and it also have some harmful impact on our environment and therefore existing transmission infrastructure is important to use effectively. FACTS is a popular solution to utilize this existing po...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
European Alliance for Innovation (EAI)
2019-06-01
|
Series: | EAI Endorsed Transactions on Energy Web |
Subjects: | |
Online Access: | https://eudl.eu/pdf/10.4108/eai.13-7-2018.157034 |
id |
doaj-1e2b6a51e68a40e8824165826a642a30 |
---|---|
record_format |
Article |
spelling |
doaj-1e2b6a51e68a40e8824165826a642a302020-11-25T02:17:58ZengEuropean Alliance for Innovation (EAI)EAI Endorsed Transactions on Energy Web2032-944X2019-06-0162310.4108/eai.13-7-2018.157034Capacity Enhancement and Voltage Stability Improvement of Power Transmission Line by Series CompensationMd. Raihan-Al-Masud0Md. Islam1Md. Hasan2Prajoy Podder3 B.Sc. in Electrical and Electronic Engineering Department of Electrical and Electronic Engineering, University of Dhaka B.Sc. in Electrical and Electronic Engineering B.Sc. in Electronics and Communication EngineeringTo install a new infrastructure of a power transmission line is not only costly but also time-consuming, and it also have some harmful impact on our environment and therefore existing transmission infrastructure is important to use effectively. FACTS is a popular solution to utilize this existing power transmission system by using series compensation by means of the series capacitor to enhance the power transmission capacity as well as voltage stability. This paper explores the utilization of series capacitor applying to the power grid of Eastern part of Bangladesh. For doing this we have considered the analytical calculation of 10% to 85% compensation of that power line. As a result, we have observed that the power transfer capacity has been enhanced about 37 times and it also improve the voltage stability, when the compensation ration is 85%. We consider our calculation mathematically and represent the load curve and voltage profile by plotting in Matlab.https://eudl.eu/pdf/10.4108/eai.13-7-2018.157034power Transmission lineReactive powerSeries compensationFACTSvoltage stabilityGrid investment |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Md. Raihan-Al-Masud Md. Islam Md. Hasan Prajoy Podder |
spellingShingle |
Md. Raihan-Al-Masud Md. Islam Md. Hasan Prajoy Podder Capacity Enhancement and Voltage Stability Improvement of Power Transmission Line by Series Compensation EAI Endorsed Transactions on Energy Web power Transmission line Reactive power Series compensation FACTS voltage stability Grid investment |
author_facet |
Md. Raihan-Al-Masud Md. Islam Md. Hasan Prajoy Podder |
author_sort |
Md. Raihan-Al-Masud |
title |
Capacity Enhancement and Voltage Stability Improvement of Power Transmission Line by Series Compensation |
title_short |
Capacity Enhancement and Voltage Stability Improvement of Power Transmission Line by Series Compensation |
title_full |
Capacity Enhancement and Voltage Stability Improvement of Power Transmission Line by Series Compensation |
title_fullStr |
Capacity Enhancement and Voltage Stability Improvement of Power Transmission Line by Series Compensation |
title_full_unstemmed |
Capacity Enhancement and Voltage Stability Improvement of Power Transmission Line by Series Compensation |
title_sort |
capacity enhancement and voltage stability improvement of power transmission line by series compensation |
publisher |
European Alliance for Innovation (EAI) |
series |
EAI Endorsed Transactions on Energy Web |
issn |
2032-944X |
publishDate |
2019-06-01 |
description |
To install a new infrastructure of a power transmission line is not only costly but also time-consuming, and it also have some harmful impact on our environment and therefore existing transmission infrastructure is important to use effectively. FACTS is a popular solution to utilize this existing power transmission system by using series compensation by means of the series capacitor to enhance the power transmission capacity as well as voltage stability. This paper explores the utilization of series capacitor applying to the power grid of Eastern part of Bangladesh. For doing this we have considered the analytical calculation of 10% to 85% compensation of that power line. As a result, we have observed that the power transfer capacity has been enhanced about 37 times and it also improve the voltage stability, when the compensation ration is 85%. We consider our calculation mathematically and represent the load curve and voltage profile by plotting in Matlab. |
topic |
power Transmission line Reactive power Series compensation FACTS voltage stability Grid investment |
url |
https://eudl.eu/pdf/10.4108/eai.13-7-2018.157034 |
work_keys_str_mv |
AT mdraihanalmasud capacityenhancementandvoltagestabilityimprovementofpowertransmissionlinebyseriescompensation AT mdislam capacityenhancementandvoltagestabilityimprovementofpowertransmissionlinebyseriescompensation AT mdhasan capacityenhancementandvoltagestabilityimprovementofpowertransmissionlinebyseriescompensation AT prajoypodder capacityenhancementandvoltagestabilityimprovementofpowertransmissionlinebyseriescompensation |
_version_ |
1724883931701968896 |