Selecting the Best Pipeline of Yemen Oil Fields & Transportation via AHP

Analytic Hierarchy Process (AHP) is a decision-making algorithm developed by Dr. Saaty. It has many applications as documented in Decision Support System literature. The importance of decisions in the oil pipeline industry is reflected in the magnitude and nature of the industry. Worldwide, pipeline...

Full description

Bibliographic Details
Main Authors: Rasheeq Mohammed Fadhl, Emin Başar Baylan
Format: Article
Language:English
Published: Collaboration (Ömer ÖZKAN, Murat Çemberci, Mustafa Emre Civelek, Nagehan Uca, Okşan Kibritçi) 2020-05-01
Series:Journal of International Trade, Logistics and Law
Subjects:
Online Access:http://www.jital.org/index.php/jital/article/view/131
id doaj-1ef1133fe45d4c14b16962400e302a4b
record_format Article
spelling doaj-1ef1133fe45d4c14b16962400e302a4b2020-11-25T03:26:25ZengCollaboration (Ömer ÖZKAN, Murat Çemberci, Mustafa Emre Civelek, Nagehan Uca, Okşan Kibritçi)Journal of International Trade, Logistics and Law2149-97482149-97482020-05-0161135146Selecting the Best Pipeline of Yemen Oil Fields & Transportation via AHPRasheeq Mohammed FadhlEmin Başar BaylanAnalytic Hierarchy Process (AHP) is a decision-making algorithm developed by Dr. Saaty. It has many applications as documented in Decision Support System literature. The importance of decisions in the oil pipeline industry is reflected in the magnitude and nature of the industry. Worldwide, pipelines transport natural gas, crude oil, and finished oil products over long distances within countries and across borders to meet energy needs. Within this proposal for decision to select the best option between multi-band variable options to arrange pipeline for transportation oil safely with lowest cost from selected point in Shabwah production oil fields S1, S2 by using AHP.in connection with current oil export terminals and pipelines available routs in Yemen, Pipeline to Rass Issa Port via safer Company-Option(1). Shabwah -Safer Mareb, Pipeline Port of Al Shahr (Al Daba) via Petro masila company Option (2). Shabwah -Masila -Hadramout, Pipeline to port (Bir Ali) via MOPS block 4 YCOM company Option (3),Shabwah selected point to MOPS, Pipeline to Aden Port Via Aden Refinery Option (4),Shabwah -Aden refinery. In this study we trying to select the best way to build a new pipeline for the Shabwah region for transportation of oil from Shabwah production fields to exports safely with lowest cost by using AHP method for comparison and pairwise selection between options and studying the criteria of comparison which was listed with the following : Criteria of Pairwise Comparison-according to ,(1).Length and distance, (2).Land nature and uses,(3). Risk assessment,(4).Cost of construction,(5).Maintenance operation,(6).Geopolitical parameter.http://www.jital.org/index.php/jital/article/view/131oil and gas industrypipeline constructionpipeline route selectionyemen region
collection DOAJ
language English
format Article
sources DOAJ
author Rasheeq Mohammed Fadhl
Emin Başar Baylan
spellingShingle Rasheeq Mohammed Fadhl
Emin Başar Baylan
Selecting the Best Pipeline of Yemen Oil Fields & Transportation via AHP
Journal of International Trade, Logistics and Law
oil and gas industry
pipeline construction
pipeline route selection
yemen region
author_facet Rasheeq Mohammed Fadhl
Emin Başar Baylan
author_sort Rasheeq Mohammed Fadhl
title Selecting the Best Pipeline of Yemen Oil Fields & Transportation via AHP
title_short Selecting the Best Pipeline of Yemen Oil Fields & Transportation via AHP
title_full Selecting the Best Pipeline of Yemen Oil Fields & Transportation via AHP
title_fullStr Selecting the Best Pipeline of Yemen Oil Fields & Transportation via AHP
title_full_unstemmed Selecting the Best Pipeline of Yemen Oil Fields & Transportation via AHP
title_sort selecting the best pipeline of yemen oil fields & transportation via ahp
publisher Collaboration (Ömer ÖZKAN, Murat Çemberci, Mustafa Emre Civelek, Nagehan Uca, Okşan Kibritçi)
series Journal of International Trade, Logistics and Law
issn 2149-9748
2149-9748
publishDate 2020-05-01
description Analytic Hierarchy Process (AHP) is a decision-making algorithm developed by Dr. Saaty. It has many applications as documented in Decision Support System literature. The importance of decisions in the oil pipeline industry is reflected in the magnitude and nature of the industry. Worldwide, pipelines transport natural gas, crude oil, and finished oil products over long distances within countries and across borders to meet energy needs. Within this proposal for decision to select the best option between multi-band variable options to arrange pipeline for transportation oil safely with lowest cost from selected point in Shabwah production oil fields S1, S2 by using AHP.in connection with current oil export terminals and pipelines available routs in Yemen, Pipeline to Rass Issa Port via safer Company-Option(1). Shabwah -Safer Mareb, Pipeline Port of Al Shahr (Al Daba) via Petro masila company Option (2). Shabwah -Masila -Hadramout, Pipeline to port (Bir Ali) via MOPS block 4 YCOM company Option (3),Shabwah selected point to MOPS, Pipeline to Aden Port Via Aden Refinery Option (4),Shabwah -Aden refinery. In this study we trying to select the best way to build a new pipeline for the Shabwah region for transportation of oil from Shabwah production fields to exports safely with lowest cost by using AHP method for comparison and pairwise selection between options and studying the criteria of comparison which was listed with the following : Criteria of Pairwise Comparison-according to ,(1).Length and distance, (2).Land nature and uses,(3). Risk assessment,(4).Cost of construction,(5).Maintenance operation,(6).Geopolitical parameter.
topic oil and gas industry
pipeline construction
pipeline route selection
yemen region
url http://www.jital.org/index.php/jital/article/view/131
work_keys_str_mv AT rasheeqmohammedfadhl selectingthebestpipelineofyemenoilfieldstransportationviaahp
AT eminbasarbaylan selectingthebestpipelineofyemenoilfieldstransportationviaahp
_version_ 1724592995847634944