Implementation of Risk Management in Manufacturing of Wellhead and Christmas Tree Equipment (Risk management framework)
Wellheads and Christmas trees are the main equipment for oil production. They are manufactured in the plant and installed on the casing head to seal the annular space between casing and tubing. They are used to transport oil to pipeline in well field. The loss of wellhead and Christmas tree integrit...
Main Authors: | Hamid Abdul, Baba Ishak Bin, Hasan Sulaiman Bin Haji, Darmawan Agung Setyo, Nushatisah |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201824803013 |
Similar Items
-
Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment
by: Hamid Abdul, et al.
Published: (2017-01-01) -
A framework for a risk assessment of the delineation of wellhead protection areas
by: Harvey, Dougall James Miln
Published: (2006) -
A framework for a risk assessment of the delineation of wellhead protection areas
by: Harvey, Dougall James Miln
Published: (2006) -
NU Christmas tree.
Published: () -
NU Christmas tree.
Published: ()