An approach to evaluate switching overvoltages during power system restoration
Transformer switching is one of the important stages during power system restoration. This switching can cause harmonic overvoltages that might damage some equipment and delay power system restoration. Core saturation on the energisation of a transformer with residual flux is a noticeable f...
Main Authors: | Sadeghkhani Iman, Ketabi Abbas, Feuillet Rene |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Technical Sciences in Cacak
2012-01-01
|
Series: | Serbian Journal of Electrical Engineering |
Subjects: | |
Online Access: | http://www.doiserbia.nb.rs/img/doi/1451-4869/2012/1451-48691202171S.pdf |
Similar Items
-
Delta-Bar-Delta and directed random search algorithms to study capacitor banks switching overvoltages
by: Sadeghkhani Iman, et al.
Published: (2012-01-01) -
Harmonic Modeling of Inrush Current in Core Type Power Transformers Using Hartley Transform
by: M. A. Taghikhani, et al.
Published: (2015-06-01) -
Detection of Harmonic Overvoltage and Resonance in AC Railways Using Measured Pantograph Electrical Quantities
by: Andrea Mariscotti, et al.
Published: (2021-09-01) -
Analysis and Explanation of Resonant Phenomena Involving EHV Transformers during Power System Restoration Tests †
by: Benato, R., et al.
Published: (2023) -
Artificial Neural Networks Approach For Estimation Of Line Energization Peak Transient Overvoltages During Restoration
by: Khandelwal, Sulabh
Published: (2011)