Study of Tunnel-Face to Borehole ERI (TBERI) Measurement Configurations and Its Optimization

Most of the existing electrical-resistivity-based ahead prospecting methods in tunnel use only the tunnel cavity and tunnel face space to locate the water-bearing structures in front of the tunnel. However, due to the limitation of the narrow available space for arranging electrodes in tunnel, this...

Full description

Bibliographic Details
Main Authors: Wei Zhou, Lichao Nie, Yongheng Zhang, Yonghao Pang, Zhao Dong, Zhimin An, Zhengyu Liu, Chuanyi Ma
Format: Article
Language:English
Published: Hindawi-Wiley 2021-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2021/1974451