Problems and prospects of nuclear power plants construction
60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power un...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2014-02-01
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | http://vestnikmgsu.ru/files/archive/issues/2014/2/ru/17.pdf |
id |
doaj-288383dd68de451f934edd687c956b2f |
---|---|
record_format |
Article |
spelling |
doaj-288383dd68de451f934edd687c956b2f2020-11-24T23:15:46ZengMoscow State University of Civil Engineering (MGSU)Vestnik MGSU 1997-09352014-02-012140153Problems and prospects of nuclear power plants constructionPergamenshhik Boris Klimentyevich0Moscow State University of Civil Engineering (MGSU)60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power units are currently under construction, 8 of them are located in the Russian Federation. There will be no alternative to nuclear energy in the coming decades. Among the factors contributing to the construction of nuclear power plants reckon limited fossil fuel supply, lack of air and primarily carbon dioxide emissions. The holding back factors are breakdown, hazard, radioactive wastes, high construction costs and long construction period. Nuclear accidents in the power plant of «Three-Mile-Island» in the USA, in Chernobyl and in Japan have resulted in termination of construction projects and closure of several nuclear power plants in the Western Europe. The safety systems have become more complex, material consumption and construction costs have significantly increased. The success of modern competing projects like EPR-1600, AP1000, ABWR, national ones AES-2006 and VVER-TOI, as well as several others, depends not only on structural and configuration but also on construction and technological solutions. The increase of the construction term by one year leads to growth of estimated total costs by 3—10 %. The main improvement potentials include external plate reinforcement, pre-fabricated large-block assembly, production and installation of the equipment packages and other. One of the crucial success factors is highly skilled civil engineers training.http://vestnikmgsu.ru/files/archive/issues/2014/2/ru/17.pdfnuclear power plants projectsduration of the constructionconstruction manufacturabilitynuclear power plantenergy unitsecuritydeterrents |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Pergamenshhik Boris Klimentyevich |
spellingShingle |
Pergamenshhik Boris Klimentyevich Problems and prospects of nuclear power plants construction Vestnik MGSU nuclear power plants projects duration of the construction construction manufacturability nuclear power plant energy unit security deterrents |
author_facet |
Pergamenshhik Boris Klimentyevich |
author_sort |
Pergamenshhik Boris Klimentyevich |
title |
Problems and prospects of nuclear power plants construction |
title_short |
Problems and prospects of nuclear power plants construction |
title_full |
Problems and prospects of nuclear power plants construction |
title_fullStr |
Problems and prospects of nuclear power plants construction |
title_full_unstemmed |
Problems and prospects of nuclear power plants construction |
title_sort |
problems and prospects of nuclear power plants construction |
publisher |
Moscow State University of Civil Engineering (MGSU) |
series |
Vestnik MGSU |
issn |
1997-0935 |
publishDate |
2014-02-01 |
description |
60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power units are currently under construction, 8 of them are located in the Russian Federation. There will be no alternative to nuclear energy in the coming decades. Among the factors contributing to the construction of nuclear power plants reckon limited fossil fuel supply, lack of air and primarily carbon dioxide emissions. The holding back factors are breakdown, hazard, radioactive wastes, high construction costs and long construction period. Nuclear accidents in the power plant of «Three-Mile-Island» in the USA, in Chernobyl and in Japan have resulted in termination of construction projects and closure of several nuclear power plants in the Western Europe. The safety systems have become more complex, material consumption and construction costs have significantly increased. The success of modern competing projects like EPR-1600, AP1000, ABWR, national ones AES-2006 and VVER-TOI, as well as several others, depends not only on structural and configuration but also on construction and technological solutions. The increase of the construction term by one year leads to growth of estimated total costs by 3—10 %. The main improvement potentials include external plate reinforcement, pre-fabricated large-block assembly, production and installation of the equipment packages and other. One of the crucial success factors is highly skilled civil engineers training. |
topic |
nuclear power plants projects duration of the construction construction manufacturability nuclear power plant energy unit security deterrents |
url |
http://vestnikmgsu.ru/files/archive/issues/2014/2/ru/17.pdf |
work_keys_str_mv |
AT pergamenshhikborisklimentyevich problemsandprospectsofnuclearpowerplantsconstruction |
_version_ |
1725589572496130048 |