Summary: | Some building defects lead to their demolition. What about construction and demolition waste? According to the Waste Act 185/2001 Coll. and its amendment 223/2015 Coll., which comes into force on January 1, 2017, the production of waste has to be reduced because, as already stated in the amendment to Act No. 229/2014 Coll., the ban on landfilling of waste will apply from 2024 onwards. The main goals of waste management can thus be considered: Preventing or minimizing waste; Waste handling to be used as a secondary raw material - recycling, composting, combustion and the remaining waste to be dumped. Company AZS 98 s. r. o. was established, among other activities, also for the purpose of recycling construction and demolition waste. It operates 12 recycling centers throughout the Czech Republic and therefore we have selected it for a demonstration of the handling of construction and demolition waste in addressing the defects of the buildings.
|