Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint
This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run leng...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2016-04-01
|
Series: | International Journal of Industrial Engineering Computations |
Subjects: | |
Online Access: | http://www.growingscience.com/ijiec/Vol7/IJIEC_2015_42.pdf |
id |
doaj-2c09b29c6a874356ac9b2e7c8e7b533a |
---|---|
record_format |
Article |
spelling |
doaj-2c09b29c6a874356ac9b2e7c8e7b533a2020-11-24T23:16:26ZengGrowing ScienceInternational Journal of Industrial Engineering Computations1923-29261923-29342016-04-017222924410.5267/j.ijiec.2015.10.006Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint Zahedi ZahediT.M.A Ari SamadhiSuprayogi Suprayogi Abdul Hakim HalimThis paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.http://www.growingscience.com/ijiec/Vol7/IJIEC_2015_42.pdfBatch productionMachine maintenanceMultiple items |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Zahedi Zahedi T.M.A Ari Samadhi Suprayogi Suprayogi Abdul Hakim Halim |
spellingShingle |
Zahedi Zahedi T.M.A Ari Samadhi Suprayogi Suprayogi Abdul Hakim Halim Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint International Journal of Industrial Engineering Computations Batch production Machine maintenance Multiple items |
author_facet |
Zahedi Zahedi T.M.A Ari Samadhi Suprayogi Suprayogi Abdul Hakim Halim |
author_sort |
Zahedi Zahedi |
title |
Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint |
title_short |
Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint |
title_full |
Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint |
title_fullStr |
Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint |
title_full_unstemmed |
Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint |
title_sort |
integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint |
publisher |
Growing Science |
series |
International Journal of Industrial Engineering Computations |
issn |
1923-2926 1923-2934 |
publishDate |
2016-04-01 |
description |
This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost. |
topic |
Batch production Machine maintenance Multiple items |
url |
http://www.growingscience.com/ijiec/Vol7/IJIEC_2015_42.pdf |
work_keys_str_mv |
AT zahedizahedi integratedbatchproductionandmaintenanceschedulingformultipleitemsprocessedonadeterioratingmachinetominimizetotalproductionandmaintenancecostswithduedateconstraint AT tmaarisamadhi integratedbatchproductionandmaintenanceschedulingformultipleitemsprocessedonadeterioratingmachinetominimizetotalproductionandmaintenancecostswithduedateconstraint AT suprayogisuprayogi integratedbatchproductionandmaintenanceschedulingformultipleitemsprocessedonadeterioratingmachinetominimizetotalproductionandmaintenancecostswithduedateconstraint AT abdulhakimhalim integratedbatchproductionandmaintenanceschedulingformultipleitemsprocessedonadeterioratingmachinetominimizetotalproductionandmaintenancecostswithduedateconstraint |
_version_ |
1725587313437704192 |