Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run leng...

Full description

Bibliographic Details
Main Authors: Zahedi Zahedi, T.M.A Ari Samadhi, Suprayogi Suprayogi, Abdul Hakim Halim
Format: Article
Language:English
Published: Growing Science 2016-04-01
Series:International Journal of Industrial Engineering Computations
Subjects:
Online Access:http://www.growingscience.com/ijiec/Vol7/IJIEC_2015_42.pdf
id doaj-2c09b29c6a874356ac9b2e7c8e7b533a
record_format Article
spelling doaj-2c09b29c6a874356ac9b2e7c8e7b533a2020-11-24T23:16:26ZengGrowing ScienceInternational Journal of Industrial Engineering Computations1923-29261923-29342016-04-017222924410.5267/j.ijiec.2015.10.006Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint Zahedi ZahediT.M.A Ari SamadhiSuprayogi Suprayogi Abdul Hakim HalimThis paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.http://www.growingscience.com/ijiec/Vol7/IJIEC_2015_42.pdfBatch productionMachine maintenanceMultiple items
collection DOAJ
language English
format Article
sources DOAJ
author Zahedi Zahedi
T.M.A Ari Samadhi
Suprayogi Suprayogi
Abdul Hakim Halim
spellingShingle Zahedi Zahedi
T.M.A Ari Samadhi
Suprayogi Suprayogi
Abdul Hakim Halim
Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint
International Journal of Industrial Engineering Computations
Batch production
Machine maintenance
Multiple items
author_facet Zahedi Zahedi
T.M.A Ari Samadhi
Suprayogi Suprayogi
Abdul Hakim Halim
author_sort Zahedi Zahedi
title Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint
title_short Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint
title_full Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint
title_fullStr Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint
title_full_unstemmed Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint
title_sort integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint
publisher Growing Science
series International Journal of Industrial Engineering Computations
issn 1923-2926
1923-2934
publishDate 2016-04-01
description This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.
topic Batch production
Machine maintenance
Multiple items
url http://www.growingscience.com/ijiec/Vol7/IJIEC_2015_42.pdf
work_keys_str_mv AT zahedizahedi integratedbatchproductionandmaintenanceschedulingformultipleitemsprocessedonadeterioratingmachinetominimizetotalproductionandmaintenancecostswithduedateconstraint
AT tmaarisamadhi integratedbatchproductionandmaintenanceschedulingformultipleitemsprocessedonadeterioratingmachinetominimizetotalproductionandmaintenancecostswithduedateconstraint
AT suprayogisuprayogi integratedbatchproductionandmaintenanceschedulingformultipleitemsprocessedonadeterioratingmachinetominimizetotalproductionandmaintenancecostswithduedateconstraint
AT abdulhakimhalim integratedbatchproductionandmaintenanceschedulingformultipleitemsprocessedonadeterioratingmachinetominimizetotalproductionandmaintenancecostswithduedateconstraint
_version_ 1725587313437704192