Optimization of Phasor Measurement Unit (PMU) Placement in Supervisory Control and Data Acquisition (SCADA)-Based Power System for Better State-Estimation Performance
Present-day power systems are mostly equipped with conventional meters and intended for the installation of highly accurate phasor measurement units (PMUs) to ensure better protection, monitoring and control of the network. PMU is a deliberate choice due to its unique capacity in providing accurate...
Main Authors: | Mohammad Shoaib Shahriar, Ibrahim Omar Habiballah, Huthaifa Hussein |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-03-01
|
Series: | Energies |
Subjects: | |
Online Access: | http://www.mdpi.com/1996-1073/11/3/570 |
Similar Items
-
An Optimal PMU Placement With Reliable Zero Injection Observation
by: Chengchao Lu, et al.
Published: (2018-01-01) -
Enhanced Optimal PMU Placements With Limited Observability Propagations
by: Xian-Chang Guo, et al.
Published: (2020-01-01) -
Presenting a New Method Based on Branch Placement for Optimal Placement of Phasor Measurement Units
by: K. Mazlumi, et al.
Published: (2014-06-01) -
Penempatan Optimal Phasor Measurement Unit (PMU) dengan Integer Programming
by: Yunan Helmy Amrulloh
Published: (2013-09-01) -
Tri-Objective Optimal PMU Placement Including Accurate State Estimation: The Case of Distribution Systems
by: Riccardo Andreoni, et al.
Published: (2021-01-01)