Modeling of Construction Cost of Villas in Oman

In this research, a model for estimating construction cost of villas is presented. The model takes into account four major factors affecting villa's cost, namely: built up area, number of toilets, number of bedrooms and the number of stories. A field survey was conducted to collect information...

Full description

Bibliographic Details
Main Authors: MA Al-Mohsin, AS Al-Nuaimi
Format: Article
Language:English
Published: Sultan Qaboos University 2014-06-01
Series:The Journal of Engineering Research
Subjects:
Online Access:https://journals.squ.edu.om/index.php/tjer/article/view/138
id doaj-31831f702ee649c698e6c4da3c153938
record_format Article
spelling doaj-31831f702ee649c698e6c4da3c1539382020-11-25T01:50:13ZengSultan Qaboos UniversityThe Journal of Engineering Research1726-60091726-67422014-06-01111344310.24200/tjer.vol11iss1pp34-43138Modeling of Construction Cost of Villas in OmanMA Al-Mohsin0AS Al-Nuaimi1Department of Civil & Architectural Engineering, College of Engineering, University of Buraimi, Buraimi, OmanDepartment of Civil & Architectural Engineering, College of Engineering Engineering, Sultan Qaboos University, PO Box 33, PC 123, Al-Khoud, Muscat, Sultanate of OmanIn this research, a model for estimating construction cost of villas is presented. The model takes into account four major factors affecting villa's cost, namely: built up area, number of toilets, number of bedrooms and the number of stories. A field survey was conducted to collect information required for such model using data collection form designed by the researchers. Information about 150 villas was collected from six well experienced consultants in the field of villa design and supervision in Oman. Collected data was analyzed to develop suggested model which consists of two main levels of estimate. The first level is at the conceptual design stage where the client presents his/her need of space and basic information about the available plot for construction. The second level of cost estimation is carried out after the preliminary design stage where the client has to decide on the finishes and type of structure. At the second level of estimation, the client should be able to decide whether to precede for construction or not, according to his/her budget. The model is general and can be used anywhere and was validated for accepted degree of confidence using the actual cost of the 112 executed villa projects in Oman. The villas included in this study were owned by clients from both high and low income brackets and had different types of finishing material. The developed equations showed good correlation between the selected variables and the actual cost with R2  = 0.79 in the case of conceptual estimate and R2  = 0.601 for preliminary estimate.https://journals.squ.edu.om/index.php/tjer/article/view/138construction cost estimate, construction cost model, cost of villas.
collection DOAJ
language English
format Article
sources DOAJ
author MA Al-Mohsin
AS Al-Nuaimi
spellingShingle MA Al-Mohsin
AS Al-Nuaimi
Modeling of Construction Cost of Villas in Oman
The Journal of Engineering Research
construction cost estimate, construction cost model, cost of villas.
author_facet MA Al-Mohsin
AS Al-Nuaimi
author_sort MA Al-Mohsin
title Modeling of Construction Cost of Villas in Oman
title_short Modeling of Construction Cost of Villas in Oman
title_full Modeling of Construction Cost of Villas in Oman
title_fullStr Modeling of Construction Cost of Villas in Oman
title_full_unstemmed Modeling of Construction Cost of Villas in Oman
title_sort modeling of construction cost of villas in oman
publisher Sultan Qaboos University
series The Journal of Engineering Research
issn 1726-6009
1726-6742
publishDate 2014-06-01
description In this research, a model for estimating construction cost of villas is presented. The model takes into account four major factors affecting villa's cost, namely: built up area, number of toilets, number of bedrooms and the number of stories. A field survey was conducted to collect information required for such model using data collection form designed by the researchers. Information about 150 villas was collected from six well experienced consultants in the field of villa design and supervision in Oman. Collected data was analyzed to develop suggested model which consists of two main levels of estimate. The first level is at the conceptual design stage where the client presents his/her need of space and basic information about the available plot for construction. The second level of cost estimation is carried out after the preliminary design stage where the client has to decide on the finishes and type of structure. At the second level of estimation, the client should be able to decide whether to precede for construction or not, according to his/her budget. The model is general and can be used anywhere and was validated for accepted degree of confidence using the actual cost of the 112 executed villa projects in Oman. The villas included in this study were owned by clients from both high and low income brackets and had different types of finishing material. The developed equations showed good correlation between the selected variables and the actual cost with R2  = 0.79 in the case of conceptual estimate and R2  = 0.601 for preliminary estimate.
topic construction cost estimate, construction cost model, cost of villas.
url https://journals.squ.edu.om/index.php/tjer/article/view/138
work_keys_str_mv AT maalmohsin modelingofconstructioncostofvillasinoman
AT asalnuaimi modelingofconstructioncostofvillasinoman
_version_ 1725002940123447296