Mixed-Integer Programming Model for Transmission Network Expansion Planning with Battery Energy Storage Systems (BESS)
This article assesses the costs and benefits of incorporating battery energy storage systems (BESS) in transmission network expansion planning (TEP) over multiple time periods. We propose a mixed-integer programming model (MIP) for joint planning of the installation of battery energy storage systems...
Main Authors: | Camilo Andres Mora, Oscar Danilo Montoya, Edwin Rivas Trujillo |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2020-08-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/13/17/4386 |
Similar Items
-
Optimal Location-Reallocation of Battery Energy Storage Systems in DC Microgrids
by: Oscar Danilo Montoya, et al.
Published: (2020-05-01) -
Evaluation of Battery Performance in MMC based BESS
Published: (2018) -
Mixed-Integer Linear Programming Model to Assess Lithium-Ion Battery Degradation Cost
by: Coelho, R.F, et al.
Published: (2022) -
Stacked-Value of Battery Storage: Effect of Battery Storage Penetration on Power Dispatch
Published: (2020) -
An Economic Analysis of Load Leveling with Battery Energy Storage Systems (BESS) in an Electricity Market Environment: The Korean Case
by: Hyung Tae Kim, et al.
Published: (2019-04-01)