A heuristics-based solution to the continuous berth allocation and crane assignment problem
Effective utilization plans for various resources at a container terminal are essential to reducing the turnaround time of cargo vessels. Among the scarcest resources are the berth and its associated cranes. Thus, two important optimization problems arise, which are the berth allocation and quay cra...
Main Authors: | Mohammad Hamdy Elwany, Islam Ali, Yasmine Abouelseoud |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2013-12-01
|
Series: | Alexandria Engineering Journal |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1110016813000896 |
Similar Items
-
A Hybrid GA with Variable Quay Crane Assignment for Solving Berth Allocation Problem and Quay Crane Assignment Problem Simultaneously
by: Hsien-Pin Hsu, et al.
Published: (2019-04-01) -
A Fuzzy Optimization Model for the Berth Allocation Problem and Quay Crane Allocation Problem (BAP + QCAP) with <em>n</em> Quays
by: Edwar Lujan, et al.
Published: (2021-02-01) -
Resources Planning for Container Terminal in a Maritime Supply Chain Using Multiple Particle Swarms Optimization (MPSO)
by: Hsien-Pin Hsu, et al.
Published: (2020-05-01) -
Integrated Berth and Crane Scheduling Problem Considering Crane Coverage in Multi-Terminal Tidal Ports under Uncertainty
by: Feng, J., et al.
Published: (2022) -
Rescheduling Strategy for Berth Planning in Container Terminals: An Empirical Study from Korea
by: Armi Kim, et al.
Published: (2021-05-01)