FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power station
Fast cut back (FCB) function can make the power station restore the external power supply in a very short period of time from the auxiliary power operation conditions through self-help mode. In case of large-scale power grid failure, FCB further ensures the safety of the main equipments and bring gr...
Main Authors: | Shuying Zhang, Lin Li, Cuihua Zhang, Yan Gao, Tao Luan |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/09/e3sconf_iaecst20_04013.pdf |
Similar Items
-
Optimization study on combustion in a 1000-MW ultra-supercritical double-tangential-circle boiler
by: Jianquan Liu, et al.
Published: (2017-11-01) -
Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants
by: Hyun-Chul Lee, et al.
Published: (2018-10-01) -
Study on test of coal co-firing for 600MW ultra supercritical boiler with four walls tangential burning
by: Ying Wu, et al.
Published: (2018-01-01) -
Investigation on Oxidation Behavior of Super304H and HR3C Steel in High Temperature Steam from a 1000 MW Ultra-Supercritical Coal-Fired Boiler
by: Jingjing Li, et al.
Published: (2019-02-01) -
Dynamic Models of Dry Electrostatic Precipitator in a 1000MW Coal-fired Plant
by: Wang Zhongwei, et al.
Published: (2019-01-01)