Specific features of initial fuel load of the innovative power unit under AES-2006 project
Experience of initial fuel loading of VVER-type reactors was analyzed prior to initiation of the “first criticality” phase of Novovoronezh NPP-II unit no. 1 commissioning. The analysis demonstrated a number of negative factors which may develop during the commissioning phase under discussion, for in...
Main Authors: | A.N. Prytkov, A.B. Tereshchenko, E.I. Golubev, I.A. Boev |
---|---|
Format: | Article |
Language: | English |
Published: |
National Research Nuclear University (MEPhI)
2017-12-01
|
Series: | Nuclear Energy and Technology |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2452303817301061 |
Similar Items
-
In-service change in the flexural rigidity of the VVER-1000 fuel assemblies
by: S.V. Pavlov
Published: (2016-12-01) -
Influence of Bypass on Thermo-Hydraulics of VVER 440 Fuel Assembly
by: Jakubec Jakub, et al.
Published: (2017-04-01) -
Operating experience and ways to improve the performance of the service water supply system at the Novovoronezh NPP II (Units 1 and 2)
by: Vladimir P. Povarov, et al.
Published: (2020-11-01) -
Simulating operation of power units 1 and 2 at Novovoronezh NPP II with two electrical feed pumps disabled and the backup pump not enabled
by: Igor N. Gusev, et al.
Published: (2021-09-01) -
Mathematical dependence for the 137Cs concentration in spent nuclear fuel and its using for experimental data processing
by: V. V Galchenko, et al.
Published: (2013-06-01)