Metaheuristic Algorithms for Proactive and Reactive Project Scheduling to Minimize Contractor’s Cash Flow Gap under Random Activity Duration
This paper investigates the project scheduling problem to minimize the maximum cash flow gap of contractors under random activity duration. A comprehensive optimization model with time buffers added to the baseline schedule by project proactive scheduling and the schedule adjustment cost determined...
Main Authors: | Minjing Ning, Zhengwen He, Nengmin Wang, Renjing Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2018-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8367813/ |
Similar Items
-
Metaheuristic Algorithms for Multimode Multiproject Scheduling With the Objective of Positive Cash Flow Balance
by: Yukang He, et al.
Published: (2019-01-01) -
Applying metaheuristic strategies in construction projects management
by: Wojciech Boejko, et al.
Published: (2012-09-01) -
Using Template Method and Strategy Design Patterns in the Python Implementation of a Metaheuristic Algorithm for Solving Scheduling Problems
by: Ewa Figielska
Published: (2017-12-01) -
Minimizing Total Resource Tardiness Penalty Costs in the Resource Constrained Project Scheduling Problem with Metaheuristic Algorithms
by: R. Golestaneh, et al.
Published: (2013-09-01) -
Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling
by: Mario Brčić, et al.
Published: (2018-01-01)