Laborer’s Efficiency of Gypsum Plastering in Sulaimani City’s Projects

In this study, the Laborer’s Efficiency (LE) in building projects in Sulaimani City practically on field sites were investigated for Gypsum plastering (GP). Accordingly, four constructional different buildings as Multistory, commercial and houses were considered. Overall 11 main important factors du...

Full description

Bibliographic Details
Main Authors: Atta Shekh Karim Abdullah, Noori Sadeq Ali, Payjor Ali Shonm Abdullah
Format: Article
Language:English
Published: Sulaimani Polytechnic University 2019-10-01
Series:Kurdistan Journal of Applied Research
Subjects:
Online Access:http://kjar.spu.edu.iq/index.php/kjar/article/view/333
id doaj-37fedbe2775c4175abc5c20f20d09061
record_format Article
spelling doaj-37fedbe2775c4175abc5c20f20d090612020-11-25T02:42:10ZengSulaimani Polytechnic UniversityKurdistan Journal of Applied Research2411-76842411-77062019-10-0142243910.24017/science.2019.2.3333Laborer’s Efficiency of Gypsum Plastering in Sulaimani City’s ProjectsAtta Shekh Karim Abdullah0Noori Sadeq Ali1Payjor Ali Shonm Abdullah2Deanery, College of Engineering,Sulaimani Polytechnic University, Sulaimani, IraqCivil Engineering Department, College of Engineering, Cihan University, Erbil, IraqCivil Engineering Department, College of Engineering, University of Sulaimani, Sulaimani, IraqIn this study, the Laborer’s Efficiency (LE) in building projects in Sulaimani City practically on field sites were investigated for Gypsum plastering (GP). Accordingly, four constructional different buildings as Multistory, commercial and houses were considered. Overall 11 main important factors during 30 practical records on field sites were practically observed.  As a result, for the first time the Laborers’ Efficiency (LE) was measured and classified into three categories high, medium and low for two specific heights which were 0-2 m and 2-3 meters height of walls. On the other hand, it concluded that the LE for the height of 0-2m affected on LP from 15.18 to 21.35m2/hr., with a proportion of 40.6%. In addition to the LE affected-on LP for the height of 2-3m and varied the LP range between 13.33-15 m2/hr., with a proportion of 12.5%.http://kjar.spu.edu.iq/index.php/kjar/article/view/333gypsum plastering, interior finishing works, laborer’s efficiency, labor productivity, skillful, skillfulness, powerful, powerfulness
collection DOAJ
language English
format Article
sources DOAJ
author Atta Shekh Karim Abdullah
Noori Sadeq Ali
Payjor Ali Shonm Abdullah
spellingShingle Atta Shekh Karim Abdullah
Noori Sadeq Ali
Payjor Ali Shonm Abdullah
Laborer’s Efficiency of Gypsum Plastering in Sulaimani City’s Projects
Kurdistan Journal of Applied Research
gypsum plastering, interior finishing works, laborer’s efficiency, labor productivity, skillful, skillfulness, powerful, powerfulness
author_facet Atta Shekh Karim Abdullah
Noori Sadeq Ali
Payjor Ali Shonm Abdullah
author_sort Atta Shekh Karim Abdullah
title Laborer’s Efficiency of Gypsum Plastering in Sulaimani City’s Projects
title_short Laborer’s Efficiency of Gypsum Plastering in Sulaimani City’s Projects
title_full Laborer’s Efficiency of Gypsum Plastering in Sulaimani City’s Projects
title_fullStr Laborer’s Efficiency of Gypsum Plastering in Sulaimani City’s Projects
title_full_unstemmed Laborer’s Efficiency of Gypsum Plastering in Sulaimani City’s Projects
title_sort laborer’s efficiency of gypsum plastering in sulaimani city’s projects
publisher Sulaimani Polytechnic University
series Kurdistan Journal of Applied Research
issn 2411-7684
2411-7706
publishDate 2019-10-01
description In this study, the Laborer’s Efficiency (LE) in building projects in Sulaimani City practically on field sites were investigated for Gypsum plastering (GP). Accordingly, four constructional different buildings as Multistory, commercial and houses were considered. Overall 11 main important factors during 30 practical records on field sites were practically observed.  As a result, for the first time the Laborers’ Efficiency (LE) was measured and classified into three categories high, medium and low for two specific heights which were 0-2 m and 2-3 meters height of walls. On the other hand, it concluded that the LE for the height of 0-2m affected on LP from 15.18 to 21.35m2/hr., with a proportion of 40.6%. In addition to the LE affected-on LP for the height of 2-3m and varied the LP range between 13.33-15 m2/hr., with a proportion of 12.5%.
topic gypsum plastering, interior finishing works, laborer’s efficiency, labor productivity, skillful, skillfulness, powerful, powerfulness
url http://kjar.spu.edu.iq/index.php/kjar/article/view/333
work_keys_str_mv AT attashekhkarimabdullah laborersefficiencyofgypsumplasteringinsulaimanicitysprojects
AT noorisadeqali laborersefficiencyofgypsumplasteringinsulaimanicitysprojects
AT payjoralishonmabdullah laborersefficiencyofgypsumplasteringinsulaimanicitysprojects
_version_ 1724774862496464896