Examination of the cost ratio of the formwork

In case of construction investments, the cost estimation was always important. The reason for this is that after the planning, the most important issue is the cost of the investment. There are many different estimation methods. These estimates may vary in depth, depending on the task and the plan. T...

Full description

Bibliographic Details
Main Authors: Zsolt Huszár, Éva Lublóy
Format: Article
Language:English
Published: Széchenyi István University 2021-05-01
Series:Acta Technica Jaurinensis
Subjects:
Online Access:https://acta.sze.hu/index.php/acta/article/view/598
id doaj-391bf2fa0d624738b9291c60ad7da076
record_format Article
spelling doaj-391bf2fa0d624738b9291c60ad7da0762021-05-31T05:35:03ZengSzéchenyi István UniversityActa Technica Jaurinensis2064-52282021-05-0114215517010.14513/actatechjaur.00598526Examination of the cost ratio of the formworkZsolt Huszár0Éva Lublóy1Budapest University of Technology and Economics, Department of Construction Technology and Management, H-1521 Budapest, HungaryBudapest University of Technology and Economics, Department of Construction Materials and Technologies, H-1521 Budapest, HungaryIn case of construction investments, the cost estimation was always important. The reason for this is that after the planning, the most important issue is the cost of the investment. There are many different estimation methods. These estimates may vary in depth, depending on the task and the plan. The question is what happens if we wanted to predict not only the total cost of the investment but also the cost of some parts and structures. Such a cost element is the formwork cost of the monolithic reinforced concrete structures. This is a special processing aid, which makes it difficult to calculate accurately. The study is based on a cost analysis of the construction of 22 completed buildings over the last 10 years. Here, the cost of the formwork was compared to the total cost of the construction. By examining the 22 buildings together, we made findings over the years. We wanted to find out how much the construction price changes affected the structure and the formwork costs. The other direction of our research was the cost analysis within each building type, focusing on the formwork. In this analysis, we defined six types of buildings, such as detached, dwelling, condominium, public, office buildings, and other types of buildings. This study does not include the cost of the formwork types specific to each component, but from the foundation to the ascending structures, it analyses them in a single system.https://acta.sze.hu/index.php/acta/article/view/598formworkcost ratiobuildings
collection DOAJ
language English
format Article
sources DOAJ
author Zsolt Huszár
Éva Lublóy
spellingShingle Zsolt Huszár
Éva Lublóy
Examination of the cost ratio of the formwork
Acta Technica Jaurinensis
formwork
cost ratio
buildings
author_facet Zsolt Huszár
Éva Lublóy
author_sort Zsolt Huszár
title Examination of the cost ratio of the formwork
title_short Examination of the cost ratio of the formwork
title_full Examination of the cost ratio of the formwork
title_fullStr Examination of the cost ratio of the formwork
title_full_unstemmed Examination of the cost ratio of the formwork
title_sort examination of the cost ratio of the formwork
publisher Széchenyi István University
series Acta Technica Jaurinensis
issn 2064-5228
publishDate 2021-05-01
description In case of construction investments, the cost estimation was always important. The reason for this is that after the planning, the most important issue is the cost of the investment. There are many different estimation methods. These estimates may vary in depth, depending on the task and the plan. The question is what happens if we wanted to predict not only the total cost of the investment but also the cost of some parts and structures. Such a cost element is the formwork cost of the monolithic reinforced concrete structures. This is a special processing aid, which makes it difficult to calculate accurately. The study is based on a cost analysis of the construction of 22 completed buildings over the last 10 years. Here, the cost of the formwork was compared to the total cost of the construction. By examining the 22 buildings together, we made findings over the years. We wanted to find out how much the construction price changes affected the structure and the formwork costs. The other direction of our research was the cost analysis within each building type, focusing on the formwork. In this analysis, we defined six types of buildings, such as detached, dwelling, condominium, public, office buildings, and other types of buildings. This study does not include the cost of the formwork types specific to each component, but from the foundation to the ascending structures, it analyses them in a single system.
topic formwork
cost ratio
buildings
url https://acta.sze.hu/index.php/acta/article/view/598
work_keys_str_mv AT zsolthuszar examinationofthecostratiooftheformwork
AT evalubloy examinationofthecostratiooftheformwork
_version_ 1721419471369797632