STUDI RUGI DAYA SISTEM KELISTRIKAN BALI AKIBAT PERUBAHAN KAPASITAS PEMBANGKITAN DI PESANGGARAN

<div class="page" title="Page 1"><table><tbody><tr><td><div class="layoutArea"><div class="column"><p><span>In the years of 2014 until 2015 Pesangaran plant </span></p></div></div>&l...

Full description

Bibliographic Details
Main Authors: I P. A. Edi Pramana, W. G. Ariastina, I. W. Sukerayasa
Format: Article
Language:English
Published: Universitas Udayana 2015-12-01
Series:Majalah Ilmiah Teknologi Elektro
Subjects:
Online Access:http://ojs.unud.ac.id/index.php/JTE/article/view/18571
Description
Summary:<div class="page" title="Page 1"><table><tbody><tr><td><div class="layoutArea"><div class="column"><p><span>In the years of 2014 until 2015 Pesangaran plant </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>capacity undergo changes due to the expiration of </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>employment contract lease diesel units and also the addition </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>of new plant unit of 200 MW PLTMG. An increase or </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>reduction in plant capacity of electrical system Bali will lead </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>to significant changes to the load flow, power losses and </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>energy losses in the circuit of Bali electrical Transmission </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>system. Load flow analysis and power losses in Bali </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>electricity system is simulated in five scenarios. Scenario 1 for </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>the conditions of existing in 2014, scenario 2 is currently </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>experiencing a reduction Pesanggaran plant capacity in </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>December 2014, scenario 3 is currently experiencing </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>Pesanggaran plant capacity additions in 2015 by using a peak </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>load of 2014, scenario 4 is the scenario 3 with using predicted </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>peak load in 2015, and scenario 5 is the scenario 4 with </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>assuming the Celukan Bawang plant operates at 130 MW. </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>Based on the results obtained by analysis, scenario 2 has the </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>most power and energy loss about 46.34 MW and 300.39 </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>GWh. For the loss of power and energy Bali electrical systems </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>after Pesanggaran plants changes in 2015 are 38.57 MW and </span></p></div></div></td></tr> <tr><td><div class="layoutArea"><div class="column"><p><span>250.05 GWh. </span></p></div></div></td></tr> <tr><td></td></tr> <tr><td></td></tr> <tr><td></td></tr> <tr><td></td></tr> <tr><td></td></tr> <tr><td></td></tr> <tr><td></td></tr> <tr><td></td></tr> <tr><td></td></tr> <tr><td></td></tr></tbody></table></div>
ISSN:1693-2951
2503-2372