Risk Assessment of Urban Rail Transit Project Using Interpretative Structural Modelling: Evidence from China

Public-private partnership (PPP) projects require comprehensive risk assessment and management, including Urban Rail Transit (URT). A more effective risk management can benefit from an accurate understanding of the two-way influence of PPP project risk factors. This paper uses the content analysis m...

Full description

Bibliographic Details
Main Authors: Yuan Gao, Chun Kit Lau
Format: Article
Language:English
Published: Hindawi Limited 2021-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2021/5581686
id doaj-3ff805849ac84f8f8be89db7c7b03726
record_format Article
spelling doaj-3ff805849ac84f8f8be89db7c7b037262021-03-08T02:00:40ZengHindawi LimitedMathematical Problems in Engineering1563-51472021-01-01202110.1155/2021/5581686Risk Assessment of Urban Rail Transit Project Using Interpretative Structural Modelling: Evidence from ChinaYuan Gao0Chun Kit Lau1International Business SchoolBeijing Normal University–Hong Kong Baptist University United International CollegePublic-private partnership (PPP) projects require comprehensive risk assessment and management, including Urban Rail Transit (URT). A more effective risk management can benefit from an accurate understanding of the two-way influence of PPP project risk factors. This paper uses the content analysis method to filter out, compare, and analyze PPP-related literature; 12 categories of 22 PPP risk factors are extracted and identified, and the possible correlations between these risk factors are judged preliminarily. With the knowledge and advice provided by PPP experts, the initial risk relationships are adjusted and supplemented, which then help to determine a reasonable logical relationship among risk factors. The logical relationship helps analyze the risk factors based on the ISM model analysis method and builds a hierarchical structure relationship of risk factors including 6 levels. Finally, the direct, intermediate, and autonomous factors that lead to problems or failures in PPP projects are analyzed which explains in detail the paths of risk transmission and risk prevention measures of PPP companies operating URT. It lays a foundation for PPP project companies operating URT to recognize, manage, and control risks in a targeted and systematic manner.http://dx.doi.org/10.1155/2021/5581686
collection DOAJ
language English
format Article
sources DOAJ
author Yuan Gao
Chun Kit Lau
spellingShingle Yuan Gao
Chun Kit Lau
Risk Assessment of Urban Rail Transit Project Using Interpretative Structural Modelling: Evidence from China
Mathematical Problems in Engineering
author_facet Yuan Gao
Chun Kit Lau
author_sort Yuan Gao
title Risk Assessment of Urban Rail Transit Project Using Interpretative Structural Modelling: Evidence from China
title_short Risk Assessment of Urban Rail Transit Project Using Interpretative Structural Modelling: Evidence from China
title_full Risk Assessment of Urban Rail Transit Project Using Interpretative Structural Modelling: Evidence from China
title_fullStr Risk Assessment of Urban Rail Transit Project Using Interpretative Structural Modelling: Evidence from China
title_full_unstemmed Risk Assessment of Urban Rail Transit Project Using Interpretative Structural Modelling: Evidence from China
title_sort risk assessment of urban rail transit project using interpretative structural modelling: evidence from china
publisher Hindawi Limited
series Mathematical Problems in Engineering
issn 1563-5147
publishDate 2021-01-01
description Public-private partnership (PPP) projects require comprehensive risk assessment and management, including Urban Rail Transit (URT). A more effective risk management can benefit from an accurate understanding of the two-way influence of PPP project risk factors. This paper uses the content analysis method to filter out, compare, and analyze PPP-related literature; 12 categories of 22 PPP risk factors are extracted and identified, and the possible correlations between these risk factors are judged preliminarily. With the knowledge and advice provided by PPP experts, the initial risk relationships are adjusted and supplemented, which then help to determine a reasonable logical relationship among risk factors. The logical relationship helps analyze the risk factors based on the ISM model analysis method and builds a hierarchical structure relationship of risk factors including 6 levels. Finally, the direct, intermediate, and autonomous factors that lead to problems or failures in PPP projects are analyzed which explains in detail the paths of risk transmission and risk prevention measures of PPP companies operating URT. It lays a foundation for PPP project companies operating URT to recognize, manage, and control risks in a targeted and systematic manner.
url http://dx.doi.org/10.1155/2021/5581686
work_keys_str_mv AT yuangao riskassessmentofurbanrailtransitprojectusinginterpretativestructuralmodellingevidencefromchina
AT chunkitlau riskassessmentofurbanrailtransitprojectusinginterpretativestructuralmodellingevidencefromchina
_version_ 1714797350664273920