ASSESSMENT OF PIT WALL AND PIT BOTTOM RESERVES WORKING OPTIONS IN THE MINE «OLENIY RUCHEY»

The relevance of the research is caused by the need to develop new ore bodies appeared in the course of advanced operational exploration. Behind the design contours of the mines there are the reserves that need to be improved either by underground or combined methods. With the technology of refining...

Full description

Bibliographic Details
Main Authors: Natalya A. Nemova, Tatyana A. Belsh
Format: Article
Language:Russian
Published: Tomsk Polytechnic University 2020-02-01
Series:Известия Томского политехнического университета: Инжиниринг георесурсов
Subjects:
Online Access:http://izvestiya.tpu.ru/archive/article/view/2480/2160
id doaj-47eb27addae445e29ab15f50fd08567a
record_format Article
spelling doaj-47eb27addae445e29ab15f50fd08567a2020-11-25T03:27:49ZrusTomsk Polytechnic UniversityИзвестия Томского политехнического университета: Инжиниринг георесурсов2500-10192413-18302020-02-013312455310.18799/24131830/2020/2/2480ASSESSMENT OF PIT WALL AND PIT BOTTOM RESERVES WORKING OPTIONS IN THE MINE «OLENIY RUCHEY»Natalya A. Nemova0Tatyana A. Belsh1Institute of Mining, Siberian Branch, Russian Academy of SciencesInstitute of Mining, Siberian Branch, Russian Academy of SciencesThe relevance of the research is caused by the need to develop new ore bodies appeared in the course of advanced operational exploration. Behind the design contours of the mines there are the reserves that need to be improved either by underground or combined methods. With the technology of refining the quarry reserves, the greatest difficulties arise, since their development causes a violation of the stability of the quarry sides. Therefore, the search, selection and justification of the parameters of the systems for developing pre-pit reserves in deposit exploration, providing effective and safe development of reserves, is a very urgent task. The main aim of the research is to consider possible options for pit mining of the pit wall and pit bottom reserves taking into account the occurrence of new ore bodies of apatite-nepheline deposit and compliance with the necessary conditions for a specified direction of mining development of mining boundary of property and to make a technical and economic assessment of the proposed options. Objects: large deposit of apatite-nepheline ores «Oleniy Ruchey». Methods: mining and geological analysis of the upper tier of deposits of apatite-nepheline ores «Oleniy Ruchey» and analysis of existing data on the physicomechanical properties of rocks composing the massif of the deposit in question, analysis of possible mining development schemes for mining deposits and reserves with an assessment of the possibility of internal dumping during quarry development. Results. On the example of development of the deposit of apatite-nepheline ores «Oleniy Ruchey», the authors considered possible options for mining and developing the pit wall and pit bottom reserves of the upper tier deposits in compliance with the conditions of development of mining boundary of property. The authors proposed the optimal development of mining operations according to the variant providing the minimum stripping ratio.http://izvestiya.tpu.ru/archive/article/view/2480/2160pit wall and pit bottom reservesore bodyschemes of openingcompletion of reservesoverburden coal ratiomining position
collection DOAJ
language Russian
format Article
sources DOAJ
author Natalya A. Nemova
Tatyana A. Belsh
spellingShingle Natalya A. Nemova
Tatyana A. Belsh
ASSESSMENT OF PIT WALL AND PIT BOTTOM RESERVES WORKING OPTIONS IN THE MINE «OLENIY RUCHEY»
Известия Томского политехнического университета: Инжиниринг георесурсов
pit wall and pit bottom reserves
ore body
schemes of opening
completion of reserves
overburden coal ratio
mining position
author_facet Natalya A. Nemova
Tatyana A. Belsh
author_sort Natalya A. Nemova
title ASSESSMENT OF PIT WALL AND PIT BOTTOM RESERVES WORKING OPTIONS IN THE MINE «OLENIY RUCHEY»
title_short ASSESSMENT OF PIT WALL AND PIT BOTTOM RESERVES WORKING OPTIONS IN THE MINE «OLENIY RUCHEY»
title_full ASSESSMENT OF PIT WALL AND PIT BOTTOM RESERVES WORKING OPTIONS IN THE MINE «OLENIY RUCHEY»
title_fullStr ASSESSMENT OF PIT WALL AND PIT BOTTOM RESERVES WORKING OPTIONS IN THE MINE «OLENIY RUCHEY»
title_full_unstemmed ASSESSMENT OF PIT WALL AND PIT BOTTOM RESERVES WORKING OPTIONS IN THE MINE «OLENIY RUCHEY»
title_sort assessment of pit wall and pit bottom reserves working options in the mine «oleniy ruchey»
publisher Tomsk Polytechnic University
series Известия Томского политехнического университета: Инжиниринг георесурсов
issn 2500-1019
2413-1830
publishDate 2020-02-01
description The relevance of the research is caused by the need to develop new ore bodies appeared in the course of advanced operational exploration. Behind the design contours of the mines there are the reserves that need to be improved either by underground or combined methods. With the technology of refining the quarry reserves, the greatest difficulties arise, since their development causes a violation of the stability of the quarry sides. Therefore, the search, selection and justification of the parameters of the systems for developing pre-pit reserves in deposit exploration, providing effective and safe development of reserves, is a very urgent task. The main aim of the research is to consider possible options for pit mining of the pit wall and pit bottom reserves taking into account the occurrence of new ore bodies of apatite-nepheline deposit and compliance with the necessary conditions for a specified direction of mining development of mining boundary of property and to make a technical and economic assessment of the proposed options. Objects: large deposit of apatite-nepheline ores «Oleniy Ruchey». Methods: mining and geological analysis of the upper tier of deposits of apatite-nepheline ores «Oleniy Ruchey» and analysis of existing data on the physicomechanical properties of rocks composing the massif of the deposit in question, analysis of possible mining development schemes for mining deposits and reserves with an assessment of the possibility of internal dumping during quarry development. Results. On the example of development of the deposit of apatite-nepheline ores «Oleniy Ruchey», the authors considered possible options for mining and developing the pit wall and pit bottom reserves of the upper tier deposits in compliance with the conditions of development of mining boundary of property. The authors proposed the optimal development of mining operations according to the variant providing the minimum stripping ratio.
topic pit wall and pit bottom reserves
ore body
schemes of opening
completion of reserves
overburden coal ratio
mining position
url http://izvestiya.tpu.ru/archive/article/view/2480/2160
work_keys_str_mv AT natalyaanemova assessmentofpitwallandpitbottomreservesworkingoptionsinthemineoleniyruchey
AT tatyanaabelsh assessmentofpitwallandpitbottomreservesworkingoptionsinthemineoleniyruchey
_version_ 1724586883165454336