Design and Exploitation Problems of Drill String in Directional Drilling

Drill string design for directional drilling requires accounting for a number of factors. First, types and expected values of loads should be determined. Then, elements of the drill string should be so selected as to enable realization of the plan at specified loads. Some of additional factors, e. g...

Full description

Bibliographic Details
Main Author: Bednarz Stanislaw
Format: Article
Language:English
Published: Technical University of Kosice 2004-09-01
Series:Acta Montanistica Slovaca
Subjects:
Online Access:http://actamont.tuke.sk/pdf/2004/n3/2bernarz.pdf
Description
Summary:Drill string design for directional drilling requires accounting for a number of factors. First, types and expected values of loads should be determined. Then, elements of the drill string should be so selected as to enable realization of the plan at specified loads. Some of additional factors, e. g. purchase, exploitation cost, geological conditions in the bore-hole, washing of the bore-hole, stability, trajectory, rig parameters, accuracy of gauges, pumps parameters remain in conflict. Drill pipes are made of rolled pipes, upset and welded with tool joints to 9,5 m long; the shorter ones can be made of hot forged rods. Exploitation requirements, being a result of practical experience supported by theoretical and laboratory analyses should be a part of syllabuses of technical staff educational programs. Apart from designing the string, it is also vital to lower the risk of a drilling failure. The significance of these aspects seems to be unquestionable.
ISSN:1335-1788